ELE13-02106
| ELE-Aging Inspection | 4/17/2018 | 4/17/2018 | 4/18/2018 7:11:17 AM | | DONE |
|
|
Please coordinate and schedule a final inspection.
|
ELE18-01423
| Final | 4/17/2018 | 4/17/2018 | 4/17/2018 2:06:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
|
ELE18-01157
| Final | 4/13/2018 | 4/17/2018 | 4/17/2018 2:05:50 PM | P | FAIL |
|
|
Phillip Phone #: ###-#### Stranded conductors feeding disconnect need to be cut and re-stripped. Some strands have been cut during stripping process. For future inspections, Boise City ordinance requires a rough in inspection.
|
ELE18-01157
| Final | 4/17/2018 | 4/17/2018 | 4/17/2018 2:04:51 PM | P | CANC |
|
|
Phillip-please call 30 mintues prior to meet for access Phone #: ###-#### Duplicate inspection.
|
ELE18-01448
| Electrical Rough-In | 4/17/2018 | 4/17/2018 | 4/17/2018 1:24:55 PM | P | PASS |
|
|
New box and circuit for floor heat cable in master bathroom. Cable will also be installed and ready for inspection. Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover floor heat mstr bath.
|
ELE16-03739
| ELE-Request for Extension | 4/16/2018 | 4/17/2018 | 4/17/2018 12:11:04 PM | A | PASS |
|
|
Keith ###-#### Spoke with homeowner. There is still work being done at location. Extension ok.
|
ELE18-01066
| Permanent Service | 4/10/2018 | 4/17/2018 | 4/17/2018 12:07:01 PM | P | PASS |
|
|
There will be guys there working. If you have any questions please feel free to contact Luke ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s o/h rec ok. Service drop already attached to new service location.
|
ELE18-01441
| Rough-In Permanent Service | 4/16/2018 | 4/17/2018 | 4/17/2018 10:48:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas p/s u/g n ok
|
ELE18-01446
| Electrical Rough-In | 4/16/2018 | 4/17/2018 | 4/17/2018 10:14:51 AM | A | PART |
|
|
underground roughin for Bollard lighting along south edge of property running from Mt Hood Ave. to the east by 350'' Phone #: ###-#### Inspection requested via web by Todd Hall Partial inspection for ground work on S side of units.
|
ELE18-01412
| Rough-In Permanent Service | 4/17/2018 | 4/17/2018 | 4/17/2018 10:13:56 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall p/s u/g n ok
|
ELE18-01361
| Rough-In Permanent Service | 4/17/2018 | 4/17/2018 | 4/17/2018 10:13:33 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall Inspected on 4/16/18
|
ELE18-01384
| Rough-In Permanent Service | 4/16/2018 | 4/17/2018 | 4/17/2018 9:34:45 AM | A | PASS |
|
|
Call Matt on the way ###-####. If you have any questions please feel free to contact Justin ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s u/g n ok. Existing panel on a warm wall. It passed previous inspections for ok to energize. 5 smoke detectors added. 4 up and 1 down.
|
ELE18-00422
| Final | 4/16/2018 | 4/17/2018 | 4/17/2018 9:07:09 AM | A | FAIL |
|
|
1993 garage code Phone #: ###-#### Inspection requested via web by Charles Davis 1. Outlets in garage on S and NE walls inop. 2. P-2 missing in garage. 3. Listed floor box cover needed upstairs. Needs to be suitable for foot traffic. 4. Remove chandalier in bath by tub. Either replace with fixture suitable for location or blank off.
|
ELE18-01184
| Final | 4/16/2018 | 4/17/2018 | 4/17/2018 12:00:00 AM | A | CANC |
|
|
Karrigan Phone #: ###-####
|