Inspections for the day of: Friday, April 17, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00205 INSP-Final Inspection4/17/20204/17/20204/17/2020 2:51:51 PMPPASS
Permit finaled

RICK FRY Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR20-00205 INSP-Sprinkler Rough-in4/17/20204/17/20204/17/2020 2:51:27 PMPPASS
Rough-in passed.

Rick Fry Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR20-00260 INSP-Sprinkler Rough-in4/17/20204/17/20204/17/2020 2:50:43 PMPPASS
Pendant head above the restroom hard lid is ok for cover.

George Jess is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00103 INSP-Final Inspection4/16/20204/17/20204/17/2020 12:29:22 PMAFAIL
The office area ceiling mounted strobes are overspaced. The truss mounted strobes in the warehouse area are overspaced. No testing performed. Need ceiling installed in the NAC panel room so the smoke detector works.

Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR20-00105 INSP-Final Inspection4/17/20204/17/20204/17/2020 12:26:46 PMPFAIL
The signal reports show a different designation for alarms than what is tested, old fire alarm devices need removed, the facp installed does not match the facp submitted, the basement plan has no stamp on it, the riser sheet was not provided. No devices tested.

Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR20-00202 INSP-Final Inspection4/15/20204/17/20204/17/2020 11:10:19 AMAFAIL
Todays inspection was a walk through to check notification devices. See city approved plans for correction needed. Plan mods will be required. No actual testing of devices happened today.

Randy Burkland - Project manager Phone #: ###-#### Inspection requested via web by Bruce Sullivan
FIR20-00222 INSP-Final Inspection4/16/20204/17/20204/17/2020 10:26:17 AMAPASS
Permit finaled.

Richard Clark is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00805 INSP-Final Inspection4/15/20204/17/20204/17/2020 9:27:28 AMAPASS
Permit finaled.

Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00805 INSP-Sprinkler Rough-in4/15/20204/17/20204/17/2020 9:27:01 AMAPASS
Rough-in passed. Phone #: ###-#### Inspection requested via web by Sam Ball
FIR19-00785 INSP-Supply line flush4/16/20204/17/20204/17/2020 9:08:28 AMACANC
cancel per contractor

screened // Tanner Phone #: ###-####
FIR20-00074 INSP-Final Inspection4/16/20204/17/20204/17/2020 7:36:22 AMAPART
Phase 1 sprinkler work is complete.

This is inspection for phase one finish. Please call Rick Fry with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
FIR20-00103 INSP-Final Inspection4/16/20204/17/20204/16/2020 1:26:46 PMACANC
Contact is Dan. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten