FIR20-00205
| INSP-Final Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 2:51:51 PM | P | PASS |
|
|
Permit finaled
RICK FRY Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR20-00205
| INSP-Sprinkler Rough-in | 4/17/2020 | 4/17/2020 | 4/17/2020 2:51:27 PM | P | PASS |
|
|
Rough-in passed.
Rick Fry Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR20-00260
| INSP-Sprinkler Rough-in | 4/17/2020 | 4/17/2020 | 4/17/2020 2:50:43 PM | P | PASS |
|
|
Pendant head above the restroom hard lid is ok for cover.
George Jess is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR20-00103
| INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/17/2020 12:29:22 PM | A | FAIL |
|
|
The office area ceiling mounted strobes are overspaced. The truss mounted strobes in the warehouse area are overspaced. No testing performed. Need ceiling installed in the NAC panel room so the smoke detector works.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR20-00105
| INSP-Final Inspection | 4/17/2020 | 4/17/2020 | 4/17/2020 12:26:46 PM | P | FAIL |
|
|
The signal reports show a different designation for alarms than what is tested, old fire alarm devices need removed, the facp installed does not match the facp submitted, the basement plan has no stamp on it, the riser sheet was not provided. No devices tested.
Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR20-00202
| INSP-Final Inspection | 4/15/2020 | 4/17/2020 | 4/17/2020 11:10:19 AM | A | FAIL |
|
|
Todays inspection was a walk through to check notification devices. See city approved plans for correction needed. Plan mods will be required. No actual testing of devices happened today.
Randy Burkland - Project manager Phone #: ###-#### Inspection requested via web by Bruce Sullivan
|
FIR20-00222
| INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/17/2020 10:26:17 AM | A | PASS |
|
|
Permit finaled.
Richard Clark is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00805
| INSP-Final Inspection | 4/15/2020 | 4/17/2020 | 4/17/2020 9:27:28 AM | A | PASS |
|
|
Permit finaled.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00805
| INSP-Sprinkler Rough-in | 4/15/2020 | 4/17/2020 | 4/17/2020 9:27:01 AM | A | PASS |
|
|
Rough-in passed. Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00785
| INSP-Supply line flush | 4/16/2020 | 4/17/2020 | 4/17/2020 9:08:28 AM | A | CANC |
|
|
cancel per contractor
screened // Tanner Phone #: ###-####
|
FIR20-00074
| INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/17/2020 7:36:22 AM | A | PART |
|
|
Phase 1 sprinkler work is complete.
This is inspection for phase one finish. Please call Rick Fry with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR20-00103
| INSP-Final Inspection | 4/16/2020 | 4/17/2020 | 4/16/2020 1:26:46 PM | A | CANC |
|
|
Contact is Dan. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|