ELE00-00986
| Electrical Rough-In | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | CANC |
|
|
###-#### see Pat Thomas at job site
|
ELE98-03567
| Electrical Rough-In | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | PART |
|
|
Ceiling Ele. R/I; areas A' & B'. 3rd floor. 2nd floor; corrections completed.
|
ELE99-04512
| Electrical Rough-In | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 11:10:53. Contact: ###-####. Nursery; wall Ele. R/I; 2nd floor. 4/19/00 9:13:02 AM
|
ELE00-01346
| Final | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PASS |
|
|
###-#### Alan Percy for access Relocated bath light fixture. 4/19/00 9:14:32 AM
|
ELE00-01205
| Final | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 08:22:45. Contact: ###-####. NEC 680-6 (A)(2) GFCI recep. 10' to 20' from wall of spa- above grade PVC conduit shall be schedule 80. Pull boxes shall be accessible without excavating earth. 4/19/00 9:13:24 AM
|
ELE00-00693
| Electrical Rough-In | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
ceiling ###-#### Ceiling Ele. R/I 4/19/00 9:14:16 AM
|
ELE00-00763
| Final | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
###-#### Temp. occ 4/19/00 9:14:22 AM
|