BLD00-00661
| BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 15:11:18. Contact: ###-####. New engineering ok to lower 4/18/00 2:02:50 PM
|
BLD99-01126
| BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 18:16:57. Contact: ###-####. Ok to sheetrock upper floor, need top of office wall restraints. 4/18/00 2:00:21 PM
|
BLD00-00156
| BLD-Final | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 18:19:01. Contact: ###-####. C/N handrail 4/18/00 2:02:35 PM
|
BLD00-00768
| BLD-Footing | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2000 at 18:21:19. Contact: ###-####. Poured, all work ok. 4/18/00 2:02:57 PM
|
BLD00-00649
| BLD-Footing | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 07:06:18. Contact: ###-####. Work not done 4/18/00 2:00:41 PM
|
BLD00-00457
| BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | A | FAIL |
|
|
###-#### C/N 4/18/00 2:02:39 PM
|
BLD00-00267
| BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | FAIL |
|
|
###-#### C/N posted. 4/19/00 9:56:45 AM
|
BLD00-00482
| BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | NR |
|
|
###-#### Recall when ready, went over requirements with framer. 4/19/00 9:56:38 AM
|
BLD00-00221
| BLD-Framing/Rough-in | 4/14/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | FAIL |
|
|
GAry ###-#### C/n vapor bariirer and 4/19/00 9:57:26 AM GAry ###-#### C/n vapor barirer and 4/19/00 9:57:26 AM 4/19/00 9:57:31 AM
|
BLD99-03561
| BLD-Final | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 07:25:15. Contact: . Temp. glass at hot tub 4/19/00 9:55:40 AM
|
BLD99-00986
| BLD-Final | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | FAIL |
|
|
###-#### gate entry *4444 C/N, temp. glass, handrail 2" min., return to wall, crawl space insualtion vappor barrier. 4/19/00 9:57:14 AM
|
BLD00-00768
| BLD-Foundation | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
###-#### Poured, all work look good. 4/19/00 9:56:23 AM
|
MIS00-00068
| BLD-Conference | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
Complaint of shed conversion w/out permits. code enforcement has already red tagged this property. Check for failure to comply w swo. post if necessary.property address is 2609. Noticed new service panel taged on 4/17/00 by electrical division, no other work noticed. 4/19/00 9:56:02 AM
|
BLD00-00649
| BLD-Footing | 4/18/2000 | 4/18/2000 | 4/18/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 09:52:12. Contact: ###-####. Appears ok no plans 4/19/00 9:56:13 AM
|