PLM01-00666
| Final | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 11:44:56. Contact: ###-####. air gap fitting required for dw temp occ ok 4/18/2001 2:59:31 PM
|
PLM01-00423
| Final | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 15:43:51. Contact: ###-####. pipe t&p to exterior 4/18/2001 9:12:24 AM
|
PLM00-04304
| Final | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | P | FAIL |
|
|
###-#### need easement 4/18/2001 4:07:19 PM
|
PLM00-03646
| Final | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | P | FAIL |
|
|
scott ###-#### need easement 4/18/2001 4:07:29 PM
|
PLM00-03645
| Final | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | P | FAIL |
|
|
scott ###-#### need easement 4/18/2001 4:07:39 PM
|
PLM00-04403
| Groundwork | 4/17/2001 | 4/18/2001 | 4/18/2001 12:00:00 AM | P | NR |
|
|
underground drain lines and interceptor Jason ###-#### interceptor not ready looked at some water lines stubed out of the wall 1st floor ne center and its waste and vent to the 2nd floor 4/18/2001 2:45:43 PM
|