Inspections for the day of: Thursday, April 18, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-03224 BLD-Final4/15/20024/18/20024/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/15/2002 at 16:06:24. Contact: ###-####. C/C issued. 4/18/2002 3:38:40 PM
BLD02-00549 BLD-Framing/Rough-in4/16/20024/18/20024/18/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/16/2002 at 12:01:55. Contact: ###-####. Shear OK. 4/18/2002 12:48:07 PM
BLD01-02807 BLD-Framing/Rough-in4/16/20024/18/20024/18/2002 12:00:00 AMAPART
shear panel- steve ###-#### Shear OK. 4/18/2002 12:47:49 PM
BLD01-02626 BLD-Final4/17/20024/18/20024/18/2002 12:00:00 AMACANC
###-#### linda Canc by owner NR 4/18/2002 12:36:27 PM
BLD02-00343 BLD-Energy code compliance4/17/20024/18/20024/18/2002 12:00:00 AMAPASS
energy code- dan- ###-####
BLD02-00536 BLD-Footing4/18/20024/18/20024/18/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 04/18/2002 at 06:49:47. Contact: ###-####. Called in wrong permit # (should be 02-00534. 4/18/2002 9:58:51 AM
BLD02-00534 BLD-Footing4/18/20024/18/20024/18/2002 12:00:00 AMAPART
Added by Inspector: 316 On 4/18/2002 9:57:34 AM Soil appears OK....No forms up at this point...9:45 am.
BLD02-00617 BLD-Footing4/18/20024/18/20024/18/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/18/2002 at 10:19:55. Contact: ###-####. Crawl footings. 4/18/2002 12:42:49 PM
BLD02-00456 BLD-Energy code compliance4/17/20024/18/20024/18/2002 12:00:00 AMPPASS
###-#### bill