Inspections for the day of: Friday, April 18, 2003.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00369 BLD-Framing/Rough-in4/17/20034/18/20034/18/2003 12:00:00 AMAPART
FRED SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs. ok to side. 4/18/2003 12:14:57 PM
BLD02-02471 BLD-Framing/Rough-in4/17/20034/18/20034/18/2003 12:00:00 AMAPART
Ok to drywall front 4/18/2003 11:35:56 AM
MEC03-00886 Final4/17/20034/18/20034/18/2003 12:00:00 AMAFAIL
fn ###-####- stevePosted c/n on furnace in house. 4/18/2003 10:27:09 AM
MEC03-00577 Final4/17/20034/18/20034/18/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Veronica England
BLD02-01612 BLD-Wall cover4/17/20034/18/20034/18/2003 12:00:00 AMPFAIL
austin; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs electrical insp and shore up 1 area over rest room went over this with Austin told him to recall when done. 4/18/2003 3:58:41 PM
BLD03-00342 BLD-Framing/Rough-in4/18/20034/18/20034/18/2003 12:00:00 AMPPASS
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Front entry framing ok aslo rear, non-rated exit way. 4/18/2003 3:55:28 PM
BLD03-00375 BLD-Conference4/18/20034/18/20034/18/2003 12:00:00 AMPPART
keith please call only; Phone #: ###-#### Internet Inspection Request from: Annette Moore. talked with contractor about wire supports at new ceiling lights. 4/18/2003 5:08:27 PM
BLD03-00301 BLD-Framing/Rough-in4/18/20034/18/20034/18/2003 12:00:00 AMPNH
###-####
BLD03-00301 BLD-Framing/Rough-in4/18/20034/18/20034/18/2003 12:00:00 AMPNH
###-#### hood shaft
BLD02-01845 BLD-Final4/18/20034/18/20034/18/2003 12:00:00 AMPFAIL
This has only had a shear nailing inspection at that time gas piping,elctrical and plumbing had not been approved for cover see records. once these items had approval they coverd all. Job is now finished contractors responce was they thought since I had done a shear wall inspection that framing was approved. I asked them why they thought I would approve the inside with out any other trades signed off. I said that I was unaware of any place in this area that would allow that. So at this point only solution is to have the architect of record write a letter stating that framing was done in accordance with plans. also still needs fire and zoning. at this final now there are no approved plans on site. Carl D on site with me at this inspection. 4/18/2003 5:19:26 PM