BLD03-00369
| BLD-Framing/Rough-in | 4/17/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | A | PART |
|
|
FRED SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs. ok to side. 4/18/2003 12:14:57 PM
|
BLD02-02471
| BLD-Framing/Rough-in | 4/17/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | A | PART |
|
|
Ok to drywall front 4/18/2003 11:35:56 AM
|
MEC03-00886
| Final | 4/17/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | A | FAIL |
|
|
fn ###-####- stevePosted c/n on furnace in house. 4/18/2003 10:27:09 AM
|
MEC03-00577
| Final | 4/17/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
BLD02-01612
| BLD-Wall cover | 4/17/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | FAIL |
|
|
austin; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs electrical insp and shore up 1 area over rest room went over this with Austin told him to recall when done. 4/18/2003 3:58:41 PM
|
BLD03-00342
| BLD-Framing/Rough-in | 4/18/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Annette Moore. Front entry framing ok aslo rear, non-rated exit way. 4/18/2003 3:55:28 PM
|
BLD03-00375
| BLD-Conference | 4/18/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | PART |
|
|
keith please call only; Phone #: ###-#### Internet Inspection Request from: Annette Moore. talked with contractor about wire supports at new ceiling lights. 4/18/2003 5:08:27 PM
|
BLD03-00301
| BLD-Framing/Rough-in | 4/18/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | NH |
|
|
###-####
|
BLD03-00301
| BLD-Framing/Rough-in | 4/18/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | NH |
|
|
###-#### hood shaft
|
BLD02-01845
| BLD-Final | 4/18/2003 | 4/18/2003 | 4/18/2003 12:00:00 AM | P | FAIL |
|
|
This has only had a shear nailing inspection at that time gas piping,elctrical and plumbing had not been approved for cover see records. once these items had approval they coverd all. Job is now finished contractors responce was they thought since I had done a shear wall inspection that framing was approved. I asked them why they thought I would approve the inside with out any other trades signed off. I said that I was unaware of any place in this area that would allow that. So at this point only solution is to have the architect of record write a letter stating that framing was done in accordance with plans. also still needs fire and zoning. at this final now there are no approved plans on site. Carl D on site with me at this inspection. 4/18/2003 5:19:26 PM
|