FIR05-00093
| INSP-Sprinkler Rough-in/Hydro | 4/15/2005 | 4/18/2005 | 4/18/2005 4:16:39 PM | P | PART |
|
|
Overhead sprinkler rough-in OK to cover, need calc. verification on 3 inch main offset at south end, need psi relief at riser for grid system.
|
FIR05-00154
| INSP-Sprinkler Rough-in | 4/18/2005 | 4/18/2005 | 4/18/2005 4:11:24 PM | P | FAIL |
|
|
Fail inspection, fire sprinkler changes in spray booth and exterior compressor room not completed.
|
FIR05-00084
| INSP-Alarm Testing | 4/15/2005 | 4/18/2005 | 4/18/2005 1:12:32 PM | A | FAIL |
|
|
Fail inspection, in-duct detectors/dampers located in upper mechanical room failed to operate properly.
|
BLD04-02978
| FIRE-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 1:06:17 PM | A | FAIL |
|
|
Fail inspection. Keyed hardware is only allowed on one door. Main entry/exit has three. See building review note #14 and fire review note #6. Remove manual flush bolts from conference room doors, see bld. review note #15. Duct detectors are mounted o
|
FIR05-00150
| INSP-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 12:57:16 PM | A | PASS |
|
|
Life safety finaled. Mag door locks operated properly under test conditions.
|
FIR04-00350
| INSP-Final Inspection | 4/18/2005 | 4/18/2005 | 4/18/2005 12:50:55 PM | A | FAIL |
|
|
Fire sprinkler rough-in inspection fail. Items need corrected include adding EQ brace 2nd floor south 2.5 in. main, upright too far off stair wall 2nd floor north, upright heads on two lines 2nd floor north are too low below deck.
|
FIR04-00811
| INSP-Final Inspection | 4/15/2005 | 4/18/2005 | 4/18/2005 9:03:23 AM | A | FAIL |
|
|
Contact: ###-####. Fail inspection, approved plans not available on site for review.
|
FIR04-00350
| INSP-Sprinkler Rough-in/Hydro | 4/18/2005 | 4/18/2005 | 4/18/2005 12:00:00 AM | P | PASS |
|
|
Overhead hydro. test OK.
|
FIR05-00093
| INSP-Sprinkler Rough-in/Hydro | 4/18/2005 | 4/18/2005 | 4/18/2005 12:00:00 AM | P | PASS |
|
|
Overhead hydro test passed.
|