| FIR-Aging Inspection | 4/18/2006 | 4/18/2006 | 4/20/2006 12:43:47 PM | | DONE |
|
|
No inspections have been requested to date.
|
FIR06-00211
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 4:47:24 PM | P | NH |
|
|
No access for inspection.
|
FIR05-00594
| INSP-Final Inspection | 4/17/2006 | 4/18/2006 | 4/18/2006 4:45:48 PM | P | FAIL |
|
|
Stairway sprinklers must be installed per NFPA 13 2002 8.14.3.2.1.
|
FIR06-00051
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 4:38:11 PM | P | FAIL |
|
|
Provide lockable supervision for the valves at the backflow prevention device, provide signage per fire code review notes at the BPD, the dry sidewall is installed in such a manner that does not prevent freezing of the supply pipe.
|
FIR05-00609
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 3:25:39 PM | P | PASS |
|
|
Fire alarm finaled.
|
FIR05-00052
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 3:25:16 PM | P | PASS |
|
|
Fire alarm passed final inspection, alarm permit finaled.
|
FIR05-00051
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 3:24:39 PM | P | PASS |
|
|
Fire alarm passed final inspection, permit finaled.
|
FIR04-00658
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 3:23:48 PM | P | PASS |
|
|
Corrections have been completed, inspection passed, permit finaled.
|
FIR04-00657
| INSP-Final Inspection | 4/18/2006 | 4/18/2006 | 4/18/2006 3:22:52 PM | P | PASS |
|
|
Corrections have been completed, inspection passed.
|
BLD05-02334
| FIRE-Final Inspection | 4/17/2006 | 4/18/2006 | 4/18/2006 2:09:53 PM | P | NR |
|
|
The project related alarm and sprinkler permits must be completed and approved prior to request for life safety final inspection.
|
FIR05-00712
| INSP-Final Inspection | 4/17/2006 | 4/18/2006 | 4/18/2006 2:07:53 PM | A | PART |
|
|
Resubmitted plans reflecting field changes verified, antifreeze tampers, co detectors, added SD, and mag locks at two locations in phase two tested okay. One set of door locks at phase 1 was not in condition to enable testing, fire doors at the second floor elevator phase 2 failed to operate due to closure adjustment issues. Updated map at the panel has been provided.
|
FIR05-00449
| INSP-Alarm Testing | 4/17/2006 | 4/18/2006 | 4/18/2006 1:59:35 PM | A | PART |
|
|
Elevator recall at floors 1-11 tested today, FD communication system intercom and phone jacks on floors 1-11 tested, voice evac re-tested on all floors, phase reversal monitoring for fire pump verified, added SD at lobby tested. Elevator machine room, elevator shutdown, main FACP, command center items per IFC, map at panel, and signal verification not inspected at this time.
|