PLM08-00011
| Plumbing Rough-in | 4/17/2008 | 4/18/2008 | 4/18/2008 4:22:02 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon
|
PLM08-00595
| Final | 4/18/2008 | 4/18/2008 | 4/18/2008 3:36:53 PM | P | PART |
|
|
troy Phone #: ###-#### need R P to dish washer need hot and cold R P to commerical washing machine need separate water supply to chemical dispenser by mop sink need three inch floor sink mim. for discharge from washing machine
|
PLM08-00571
| Groundwork | 4/18/2008 | 4/18/2008 | 4/18/2008 3:27:12 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/18/2008 at 7:29:52 AM. Contact: ###-####.
|
PLM08-00877
| Groundwork | 4/18/2008 | 4/18/2008 | 4/18/2008 2:28:31 PM | P | PASS |
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige
|
PLM07-01944
| Plumbing Rough-in | 4/18/2008 | 4/18/2008 | 4/18/2008 2:04:50 PM | P | PASS |
|
|
steve Phone #: ###-#### for up staires main bath rough-in only at this time
|
PLM08-00872
| Water and/or Sewer | 4/18/2008 | 4/18/2008 | 4/18/2008 1:20:54 PM | P | FAIL |
|
|
Bill Phone #: ###-#### neeed to uncover tie-in to meter stub for inspection unable to find a shut off or drain down valve need to have vented portion of R P 12 inches above finished grade need to have R P tested and certified called contractor will recall when ready left correction notice on site
|
PLM08-00803
| Water and/or Sewer | 4/18/2008 | 4/18/2008 | 4/18/2008 12:58:40 PM | P | PASS |
|
|
steve - also underground Phone #: ###-#### water, sewer and ground work test ok
|
PLM08-00443
| Final | 4/17/2008 | 4/18/2008 | 4/18/2008 12:41:56 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/17/2008 at 5:02:32 PM. Contact: ###-####.
|
PLM08-00034
| Plumbing Rough-in | 4/18/2008 | 4/18/2008 | 4/18/2008 12:18:17 PM | P | PASS |
|
|
|
PLM08-00790
| Water and/or Sewer | 4/17/2008 | 4/18/2008 | 4/18/2008 11:20:21 AM | A | FAIL |
|
|
bw Phone #: ###-####-- call 1st before insp test failed on sewer line need to correct reverse grade in A B S need to cut out pvc 3034 fitting,s and repipe with approved glue need to add an additional clean out in 3034 pvc line over 135 degree turn contractor to recall when ready
|
PLM08-00825
| Plumbing Rough-in | 4/17/2008 | 4/18/2008 | 4/18/2008 11:14:53 AM | P | CANC |
|
|
this definately a rough-in inspection. sj Phone #: ###-#### Internet Inspection Request from: Erin Whiting plumbing rough-in was done on 4/16/2008
|
PLM08-00743
| Plumbing Rough-in | 4/16/2008 | 4/18/2008 | 4/18/2008 9:43:13 AM | A | CANC |
|
|
Ready by 10:00AM Phone #: ###-#### Internet Inspection Request from: John Hensley
|
PLM08-00854
| Water and/or Sewer | 4/17/2008 | 4/18/2008 | 4/18/2008 9:31:27 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom
|
PLM08-00854
| DOC - Permit Finaled | 4/18/2008 | 4/18/2008 | 4/18/2008 9:31:14 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom
|
PLM08-00382
| Final | 4/18/2008 | 4/18/2008 | 4/18/2008 9:22:20 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Brent Lacy
|
PLM08-00034
| Plumbing Rough-in | 4/17/2008 | 4/18/2008 | 4/18/2008 8:55:37 AM | A | PART |
|
|
Nate Sturlin is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet water system test ok still need to test roof and overflow drains and vent,s contractor to recall when ready
|
PLM08-00825
| Final | 4/17/2008 | 4/18/2008 | 4/17/2008 12:41:15 PM | A | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Erin Whiting Inspection cancelled from web by: Erin Whiting
|