FIR07-00905
| INSP-Sprinkler Rough-in/Hydro | 4/18/2008 | 4/18/2008 | 4/18/2008 4:58:32 PM | P | PART |
|
|
Final pending supply line flush completion and future building construction for floor slab seisimic clearance.
|
FIR07-00683
| INSP-Final Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 4:49:55 PM | P | PASS |
|
|
Corrections are complete, fire sprinkler permit finaled.
|
FIR05-00462
| INSP-Final Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 4:47:03 PM | P | PASS |
|
|
Fire alarm permit finaled, see site inspection comments 10/20/05.
|
BLD07-03242
| FIRE-Final Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 4:40:44 PM | P | NR |
|
|
Project is not in condition for final at this time, also need related fire alarm permit finaled prior to life safety approval.
|
FIR08-00160
| INSP-Sprinkler Rough-in/Hydro | 4/18/2008 | 4/18/2008 | 4/18/2008 4:39:15 PM | P | PART |
|
|
Overhead rough-in is approved for cover as noted on plans.
|
BLD07-03264
| FIRE-Final Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 11:43:16 AM | A | FAIL |
|
|
Final pending repair of four exit signs at the first floor area.
|
FIR08-00040
| INSP-Final Inspection | 4/17/2008 | 4/18/2008 | 4/18/2008 11:39:53 AM | A | PASS |
|
|
Fire alarm work passed field testing, noted suppression cabinet to be anchored and labeled as discussed.
|
FIR08-00081
| INSP-Final Inspection | 4/17/2008 | 4/18/2008 | 4/18/2008 9:56:58 AM | A | PASS |
|
|
Fire sprinkler permit finaled, field modifications are acceptable.
|
FIR08-00131
| INSP-Final Inspection | 4/17/2008 | 4/18/2008 | 4/18/2008 9:54:46 AM | A | PASS |
|
|
Fire alarm system testing passed field inspection at the tenant remodel area, permit finaled.
|