Inspections for the day of: Friday, April 18, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00905 INSP-Sprinkler Rough-in/Hydro4/18/20084/18/20084/18/2008 4:58:32 PMPPART
Final pending supply line flush completion and future building construction for floor slab seisimic clearance.
FIR07-00683 INSP-Final Inspection4/18/20084/18/20084/18/2008 4:49:55 PMPPASS
Corrections are complete, fire sprinkler permit finaled.
FIR05-00462 INSP-Final Inspection4/18/20084/18/20084/18/2008 4:47:03 PMPPASS
Fire alarm permit finaled, see site inspection comments 10/20/05.
BLD07-03242 FIRE-Final Inspection4/18/20084/18/20084/18/2008 4:40:44 PMPNR
Project is not in condition for final at this time, also need related fire alarm permit finaled prior to life safety approval.
FIR08-00160 INSP-Sprinkler Rough-in/Hydro4/18/20084/18/20084/18/2008 4:39:15 PMPPART
Overhead rough-in is approved for cover as noted on plans.
BLD07-03264 FIRE-Final Inspection4/18/20084/18/20084/18/2008 11:43:16 AMAFAIL
Final pending repair of four exit signs at the first floor area.
FIR08-00040 INSP-Final Inspection4/17/20084/18/20084/18/2008 11:39:53 AMAPASS
Fire alarm work passed field testing, noted suppression cabinet to be anchored and labeled as discussed.
FIR08-00081 INSP-Final Inspection4/17/20084/18/20084/18/2008 9:56:58 AMAPASS
Fire sprinkler permit finaled, field modifications are acceptable.
FIR08-00131 INSP-Final Inspection4/17/20084/18/20084/18/2008 9:54:46 AMAPASS
Fire alarm system testing passed field inspection at the tenant remodel area, permit finaled.