ESC07-01300
| Site Preparation | 4/16/2008 | 4/18/2008 | 4/21/2008 2:36:00 PM | P | PART |
|
|
Site was cleaned up but BMP needed to be put back in place. CAS #460
|
ESC07-01393
| Complaint Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 3:19:40 PM | P | FAIL |
|
|
Notice of Correction In sufficent permiter BMPs Bmp maintenance needed No Drain inlet protection Failure to comply will result in a STOP WORK ORDER will re-inspect Monday the 21st CAS #460
|
ESC07-01557
| Complaint Inspection | 4/18/2008 | 4/18/2008 | 4/18/2008 3:19:23 PM | P | FAIL |
|
|
Notice of Correction In sufficent permiter BMPs Bmp maintenance needed No Drain inlet protection Failure to comply will result in a STOP WORK ORDER will re-inspect Monday the 21st CAS #460
|
ESC06-00686
| BMP Violation | 4/16/2008 | 4/18/2008 | 4/18/2008 3:14:44 PM | P | PASS |
|
|
Hydro seed or Hydro staw has been applied to all disturbed area that will be dormit. CAS #460
|
ESC07-00751
| Site Preparation | 4/17/2008 | 4/18/2008 | 4/18/2008 10:28:28 AM | A | PART |
|
|
Need to Re-install Bmps to proect channel and install DI protection. Met with the 3rd party consultant over project start-up CAS #460
|
ESC08-00271
| Site Preparation | 4/18/2008 | 4/18/2008 | 4/18/2008 8:57:13 AM | A | PART |
|
|
Need to post ESC sign. Dome work almost complete. CAS #460
|