PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, April 18, 2011
.
Number of inspections:
8
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00285
Aging Inspection
4/18/2011
4/18/2011
4/19/2011 1:37:54 PM
PASS
ESC10-00657
General Inspection
4/18/2011
4/18/2011
4/19/2011 10:36:32 AM
A
DONE
All vertical slopes except for the slope behind the building pad have had PAM 12 w/ seed applied to them. Starting to see vegitation on all the areas where the PAM12 w/ seed was applied. But only about 5% or less of total area has vegitation coverage.
The RP (Mike Martin) explained that he will be checking on the building plan to see what is the plan for the slope behind the future home is. It could have a terraced retaining wall set up. Will contact the erosion conrtol manager with an answer on the slope stabilization meathod. The ESC/ SWPPP plan shows that there is five options for stabilization on the vertical slopes over a 5% grade.
1. Mulch
2. Seeding
3. Matting (Jute Netting)
4. Top soil spreading with seed and tachifier
5. Retaining wall.
Waiting on an anwser from the project owner on the final stabilization method.
ESC11-00184
General Inspection
4/18/2011
4/18/2011
4/19/2011 10:35:31 AM
P
PASS
Went over where project area in there phases. Walked the dewatering and the area where the discharge is. Told the RP to inspect the discharge point into the new Wallings corador for turbidity. If a turbid discharge is occuring to devert the water away from the Wallings corador. All in all, the project areas are in active accept for the area south of Warm Springs Rd. Will become active once the soil becomes dry.
ESC10-00675
BMP Violation
4/14/2011
4/18/2011
4/18/2011 5:33:11 PM
A
PART
Waiting on storm drains to be maintained.
ESC11-00053
Site Preparation
4/12/2011
4/18/2011
4/18/2011 9:54:00 AM
A
NR
ESC11-00199
Site Preparation
4/18/2011
4/18/2011
4/18/2011 9:53:26 AM
NR
ESC11-00117
General Inspection
4/18/2011
4/18/2011
4/18/2011 9:25:19 AM
A
PASS
ESC10-00361
Site Final
4/11/2011
4/18/2011
4/18/2011 8:57:30 AM
A
FAIL
Verbal to RP:
Remove storm drain inlet protection to final out permit. RP informed me he will have it done. Will re-inspect on 4/22/2011am