Inspections for the day of: Wednesday, April 18, 2012.
Number of inspections: 7
Percentage of inspections complete: 71 %
Percentage of inspections not complete: 29 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00190 Site Preparation4/13/20124/13/2012   
ESC09-00213 Aging Inspection4/16/20124/16/2012   
ESC11-00879 General Inspection4/18/20124/18/20124/23/2012 9:07:08 PM FAIL
Refer to Stop Work Order Inspection for all required corrections.
ESC12-00036 General Inspection4/18/20124/18/20124/19/2012 9:16:24 AM PART
Verbal to RP;
Inspect and add staking to all sediment barriers (composted wattles) where needed.
ESC12-00023 General Inspection4/18/20124/18/20124/19/2012 9:15:23 AM FAIL
Verbal to RP:
Provide sediment barriers along the irragation/ storm water canal where the bank are disturbed and stabilizing tachifier was not hydrolicy applied.
MIS11-00196 MIS-Aging Inspection4/18/20124/18/20124/19/2012 9:13:16 AM DONE
Permit finaled due permit being issued.
ESC12-00077 General Inspection4/18/20124/18/20124/19/2012 9:10:32 AM PART
Need to estabish a stabilized construction exit.