ESC12-00190
| Site Preparation | 4/13/2012 | 4/13/2012 | | | |
|
|
|
ESC09-00213
| Aging Inspection | 4/16/2012 | 4/16/2012 | | | |
|
|
|
ESC11-00879
| General Inspection | 4/18/2012 | 4/18/2012 | 4/23/2012 9:07:08 PM | | FAIL |
|
|
Refer to Stop Work Order Inspection for all required corrections.
|
ESC12-00036
| General Inspection | 4/18/2012 | 4/18/2012 | 4/19/2012 9:16:24 AM | | PART |
|
|
Verbal to RP; Inspect and add staking to all sediment barriers (composted wattles) where needed.
|
ESC12-00023
| General Inspection | 4/18/2012 | 4/18/2012 | 4/19/2012 9:15:23 AM | | FAIL |
|
|
Verbal to RP: Provide sediment barriers along the irragation/ storm water canal where the bank are disturbed and stabilizing tachifier was not hydrolicy applied.
|
MIS11-00196
| MIS-Aging Inspection | 4/18/2012 | 4/18/2012 | 4/19/2012 9:13:16 AM | | DONE |
|
|
Permit finaled due permit being issued.
|
ESC12-00077
| General Inspection | 4/18/2012 | 4/18/2012 | 4/19/2012 9:10:32 AM | | PART |
|
|
Need to estabish a stabilized construction exit.
|