Inspections for the day of: Thursday, April 18, 2013.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE09-02444 ELE-Aging Inspection4/18/20134/18/20134/23/2013 10:30:59 AM DONE
Drove by to make contact, no answer so left correction notice
ELE10-01532 ELE-Aging Inspection4/18/20134/18/20134/19/2013 4:20:20 PM DONE
still under construction
ELE13-00950 Electrical Rough-In4/18/20134/18/20134/18/2013 4:00:39 PMPPASS
>> Inspection requested via web by Dan Hobdey Check service riser on final.
Garage addition rough in ok cover
ELE13-00831 Electrical Rough-In4/18/20134/18/20134/18/2013 3:33:48 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Phil Baker East bedrooms not part of remodel. Rough in ok cover
ELE13-00917 Permanent Service4/18/20134/18/20134/18/2013 2:50:13 PMPFAIL
David Phone #: ###-#### 2nd ground rod shall be installed.
ELE13-00216 Final4/18/20134/18/20134/18/2013 2:25:11 PMPPASS
Brian Phone #: ###-#### Bathroom remodel final ok
ELE13-00938 Rough-In Permanent Service4/17/20134/18/20134/18/2013 2:15:14 PMPFAIL
Phone #: ###-#### >> Inspection requested via web by Zane Robertson
1- Receptical located in entry not wired.
2- 210.52 General purpose receptical shall be installed within 6' of door on right side.
3- 250.148 Non-current-carrying metal parts shall be grounded.
ELE11-02806 Electrical Rough-In4/17/20134/18/20134/18/2013 1:40:24 PMAPASS
Rock, we need the rest of the lobby and north hallway ceilings approved for cover, call mike ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Hall north of elevator ceiling rough in ok cover.
Area in front of elevator by city council chamber to be left open due to low volt wiring laying on grid
ELE13-00807 Electrical Rough-In4/17/20134/18/20134/18/2013 10:42:11 AMAPASS
Ceiling inspection - contact is Alan Krisknek Phone #: ###-#### >> Inspection requested via web by Scott Campbell
ANOP 2nd floor ceiling rough in ok cover
ELE13-00944 Electrical Rough-In4/17/20134/18/20134/18/2013 10:14:33 AMAPASS
rough in out building in back Phone #: ###-#### >> Inspection requested via web by mike brown Art studio rough in ok cover
ELE12-02909 Final4/17/20134/18/20134/18/2013 8:45:54 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Jim Williams
Final ok