MEC12-04699
| Final | 4/18/2013 | 4/18/2013 | 4/18/2013 4:32:27 PM | P | FAIL |
|
|
Please call Aaron or Sean Cafferty ###-#### Phone #: ###-#### >> Inspection requested via web by john shay...NEED COMB AIR FOR W/H IN ENCLOSURE..NEED SECONDARY FOR FURNACE..SUPPORT LINE SET OUT OF DIRT..AIR BALANCE REPORT?
|
MEC12-04711
| Final | 4/17/2013 | 4/18/2013 | 4/18/2013 4:30:46 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Sheldon Lebow
|
MEC13-01494
| Final | 4/17/2013 | 4/18/2013 | 4/18/2013 4:29:40 PM | P | PASS |
|
|
Please call Innes before going, thank you Phone #: ###-#### >> Inspection requested via web by Michele LaMott
|
MEC13-01470
| Pressure Test | 4/18/2013 | 4/18/2013 | 4/18/2013 4:29:05 PM | P | PASS |
|
|
oleg Phone #: ###-####...20LB GAS OK
|
MEC13-01470
| Rough-in | 4/18/2013 | 4/18/2013 | 4/18/2013 4:28:11 PM | P | FAIL |
|
|
oleg Phone #: ###-####...NEED APPROVED MANUAL J ON SITE...NEED TO SHIELD HORIZ SECTION OF W/H FLUE...NEED NAIL PLATE AT DRYER VENT..NEED 6' FRESH AIR WITH A DAMPER ..DAMPERS TO BE IN ALL SUPPLY DUCTS
|
MEC13-01317
| Final | 4/17/2013 | 4/18/2013 | 4/18/2013 3:17:51 PM | P | PASS |
|
|
Call Eric @ ###-#### with any issues. Phone #: ###-#### >> Inspection requested via web by Angie maguire
|
GCM13-00092
| GCM-Rough-in | 4/18/2013 | 4/18/2013 | 4/18/2013 2:20:18 PM | P | PASS |
|
|
Kari ###-####...f/p r/i ok....gas was existing
|
GCM13-00088
| GCM-Rough-in | 4/18/2013 | 4/18/2013 | 4/18/2013 1:51:38 PM | P | PASS |
|
|
Russ ###-#### house open...r/i and 20lb gas ok...CHECK DUCT BLASTER AT FINAL
|
GCM13-00032
| GCM-Final | 4/18/2013 | 4/18/2013 | 4/18/2013 1:31:06 PM | P | PASS |
|
|
Kari ###-####
|