FIR09-00510
| FIR-Aging Inspection | 4/18/2013 | 4/18/2013 | 4/25/2013 7:57:28 AM | | NR |
|
|
work is in progress
|
BLD11-00631
| FIRE-Final Inspection | 4/18/2013 | 4/18/2013 | 4/18/2013 3:49:19 PM | P | PASS |
|
|
life safety passed
|
FIR13-00135
| INSP-Sprinkler Rough-in | 4/17/2013 | 4/18/2013 | 4/18/2013 3:41:53 PM | A | PASS |
|
|
See the city approved plans for locations marked "ok" in red where sprinkler piping can be covered.
|
FIR12-00515
| INSP-Final Inspection | 4/18/2013 | 4/18/2013 | 4/18/2013 3:26:43 PM | A | PASS |
|
|
permit finaled
|
BLD13-00564
| FIRE-Final Inspection | 4/12/2013 | 4/18/2013 | 4/18/2013 2:57:42 PM | A | PASS |
|
|
life safety passed
|
BLD12-01991
| BLD-Conference | 4/12/2013 | 4/18/2013 | 4/18/2013 2:24:16 PM | A | DONE |
|
|
Meeting AT ESI OFFICE with other inspectors to discuss the documentation of inspections
|
FIR11-00458
| INSP-Final Inspection | 4/17/2013 | 4/18/2013 | 4/18/2013 2:21:10 PM | A | PASS |
|
|
Permit finaled
|