FIR14-00113
| INSP-Final Inspection | 4/16/2014 | 4/18/2014 | 4/18/2014 4:05:00 PM | A | DEFR |
|
|
Tim Phone #: ###-####
|
BLD12-03324
| FIRE-Final Inspection | 4/18/2014 | 4/18/2014 | 4/18/2014 4:04:29 PM | P | PASS |
|
|
Verified scope of work per most recent plan modification for the storage and office area expansion. Hardware at the intermediate exit door to the south to be replaced with compliant style prior to structural final as discussed.
|
FIR14-00077
| INSP-Alarm Testing | 4/18/2014 | 4/18/2014 | 4/18/2014 2:34:05 PM | P | CANC |
|
|
Call prior to going Phone #: 2089411846 >> Inspection requested via mobile web by Brian A. Inspection cancelled via mobile web on Friday, April 18, 2014.
|
FIR14-00121
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/18/2014 | 4/18/2014 1:12:41 PM | A | PART |
|
|
Overhead fire sprinkler rough-in at the 3rd floor restrooms, vestibules, storage room and two sheetrock lid ceilings in the common corridor per dated notes okayed for cover.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/18/2014 | 4/18/2014 1:09:52 PM | A | PART |
|
|
Okay to cover overhead work at the 5th floor mens and womens restrooms and adjacent vestibules- Refer to dated annotations on stamped plan set.
|
FIR13-00689
| INSP-Sprinkler Rough-in | 4/17/2014 | 4/18/2014 | 4/18/2014 1:02:07 PM | A | PART |
|
|
4th floor corridor, janitors room, and storage rooms as marked on stamped plans with todays date okayed for cover.
|
FIR13-00713
| INSP-Sprinkler Rough-in/Hydro | 4/18/2014 | 4/18/2014 | 4/18/2014 10:11:28 AM | P | CANC |
|
|
Please call Nick 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|
FIR14-00061
| INSP-Final Inspection | 4/17/2014 | 4/18/2014 | 4/18/2014 10:06:34 AM | A | PASS |
|
|
Scope of fire sprinkler system modifications completed. Inspection passed, permit finaled.
|