ELE16-01221
| Electrical Rough-In | 4/18/2016 | 4/18/2016 | 4/18/2016 2:54:48 PM | P | PASS |
|
|
Call first so I can be sure someone is there. Phone #: ###-#### Inspection requested via web by Greg Idsinga r/i bathroom ok
|
ELE16-01016
| Rough-In Permanent Service | 4/18/2016 | 4/18/2016 | 4/18/2016 2:40:31 PM | P | PASS |
|
|
rough and service Phone #: ###-#### Inspection requested via web by Rowdy Monroe r/i ok p/s u/g n ok called and talked to secratary and informed her of nailplates needed at 4 spots
|
ELE15-02641
| Electrical Rough-In | 4/16/2016 | 4/18/2016 | 4/18/2016 2:00:18 PM | P | PASS |
|
|
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ok rooms 401, 402 and 403
|
ELE16-00623
| Final | 4/18/2016 | 4/18/2016 | 4/18/2016 1:20:44 PM | P | FAIL |
|
|
Please call Jeff if you have any questions. The door should be unlocked if not just knock. Thanks Phone #: ###-#### Inspection requested via web by Brandon Blackham GFCI not functioning
|
ELE15-00830
| Final | 4/15/2016 | 4/18/2016 | 4/18/2016 1:02:31 PM | P | PASS |
|
|
CONTACT - DERRICK KAMPER Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
ELE13-03438
| Final | 4/15/2016 | 4/18/2016 | 4/18/2016 12:57:42 PM | P | PASS |
|
|
CONTACT: DERRICK KAMPER Phone #: ###-#### Inspection requested via web by Deb Gooden final ok checked generator, chillers, air handelers in IT and basement MSB and associated panels
|
ELE16-00089
| Conference | 4/15/2016 | 4/18/2016 | 4/18/2016 9:37:04 AM | A | DONE |
|
|
Look at option of installing plywood to 5th floor mezzanine wall up only 4'' AFF. Looking to see if this would cause any issues for damage to electrical installation by Boise City electrical inspector. Call Rafael at ###-####. Phone #: ###-#### Inspection requested via web by Rafael Castillo discuss mc cable in wall only being sheeted up to 48". mc cable looks ok at just under 48" installed horizontilly in wall. If subject to physical dammage,install stud to protect
|
ELE16-00870
| Electrical Rough-In | 4/15/2016 | 4/18/2016 | 4/18/2016 8:59:38 AM | A | PASS |
|
|
Ceiling inspection please Phone #: ###-#### Inspection requested via web by Celinda Winters r/i ceilings ok
|
ESC15-01369
| Tracking Control | 4/18/2016 | 4/18/2016 | 4/18/2016 8:36:58 AM | P | FAIL |
|
|
schedule insp rocks and debris in road
|
ELE16-01214
| Temporary Service | 4/15/2016 | 4/18/2016 | 4/18/2016 8:29:05 AM | A | PASS |
|
|
Larry Phone #: ###-#### t/s o/h n ok
|
ELE16-01207
| Electrical Rough-In | 4/15/2016 | 4/18/2016 | 4/18/2016 8:06:23 AM | A | PASS |
|
|
Please provide a ufer inspection at the U-haul Orchard facility. Contact John at ###-####. Phone #: ###-#### Inspection requested via web by Kevin Perez r/i ufer ok
|
ELE16-01134
| Electrical Rough-In | 4/18/2016 | 4/18/2016 | 4/18/2016 12:00:00 AM | A | PASS |
|
|
We are requesting a service grounding conference on the main service. Our contact is Tony @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tater/i ok grounding electrode conductor for MSB and x formers to common ground plate
|