FIR17-00172
| INSP-Sprinkler Rough-in | 4/18/2017 | 4/18/2017 | 4/18/2017 1:05:24 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR16-00712
| INSP-Sprinkler Rough-in | 4/18/2017 | 4/18/2017 | 4/18/2017 12:17:06 PM | P | PASS |
|
|
Underground supply piping from the IBR to the road box is ok to cover.
|
BLD17-00482
| FIRE-Final Inspection | 4/17/2017 | 4/18/2017 | 4/18/2017 9:10:09 AM | A | PASS |
|
|
life safety passed
|
BLD12-02338
| FIRE-Final Inspection | 4/17/2017 | 4/18/2017 | 4/18/2017 8:40:34 AM | A | PASS |
|
|
life safety passed
|
BLD13-00021
| FIRE-Final Inspection | 4/17/2017 | 4/18/2017 | 4/18/2017 8:40:06 AM | A | PASS |
|
|
Life safety passed
|
BLD12-02966
| FIRE-Final Inspection | 4/17/2017 | 4/18/2017 | 4/18/2017 12:00:00 AM | A | FAIL |
|
|
Deffered to Assistant Fire Marshal for altnerate approval. At least one of the new electronic access security gates from the public roadway will need to be outfitted with the Opticom entry system for BMC compliance.
|