NAF15-00026
| INSP-Final | 4/17/2017 | 4/18/2017 | 4/18/2017 2:13:31 PM | A | PART |
|
|
Partial final complete for life fire safey inspection, fire sprinklers are complete, fire alarms for this building are complete, fire extinguishers are in place with current inspection tags, Residential Emergency Guides will be placed in resident apartments at a later date. When Residential Emergency Guides are complete and in place then life fire safety can be finaled.
|
NAF16-00012
| INSP-Final | 4/17/2017 | 4/18/2017 | 4/18/2017 1:30:22 PM | P | PASS |
|
|
Previously noted items have been repaired, sprinkler heads next to registers on level 3 will be changed to an intermediate temperature head (sprinkler heads are less than 24 inches away from heat register). Final fire sprinkler passed/complete
|
FIR16-00040
| INSP-Supply line flush | 4/13/2017 | 4/18/2017 | 4/18/2017 11:49:02 AM | A | CANC |
|
|
Suez was not scheduled for 530 flush time, flush needs to be after hours due to traffic at valve location, flush is rescheduled for 530AM, 19APR2017.
|