MEC17-01076
| Mec-Aging Inspection | 4/18/2018 | 4/18/2018 | 4/19/2018 3:27:46 PM | | PEND |
|
|
contractor to schedule final per phone call
|
MEC18-01717
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 4:09:05 PM | P | PASS |
|
|
Call Eric to coordinate @ 412.6613 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- furnace ac coil co ok
|
MEC18-01717
| Pressure Test | 4/17/2018 | 4/18/2018 | 4/18/2018 4:07:56 PM | P | PASS |
|
|
Call Eric to coordinate @ 412.6613 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek- 5lb flue pass
|
MEC18-01680
| Final | 4/16/2018 | 4/18/2018 | 4/18/2018 3:52:39 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace ac coil co ok
|
MEC18-01680
| Pressure Test | 4/18/2018 | 4/18/2018 | 4/18/2018 3:52:21 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- 5lb flue pass
|
MEC18-01727
| Final | 4/18/2018 | 4/18/2018 | 4/18/2018 3:05:07 PM | P | NH |
|
|
Inspection requested via web by MARGIE ROWE- no one home no access- need permit for new electrical to outdoor heat pump ?
|
MEC18-01703
| Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 2:23:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
MEC18-01703
| Pressure Test | 4/18/2018 | 4/18/2018 | 4/18/2018 2:17:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
MEC18-01647
| Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 1:29:46 PM | P | PART |
|
|
meet at 115 pm with Dave-2083918945- part R/I inspection on hard lids- ok to cover hard lids only
|
MEC18-01448
| Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 11:55:00 AM | A | PASS |
|
|
BARBARA ###-#### OR ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace R/I ok
|
MEC18-01448
| Pressure Test | 4/17/2018 | 4/18/2018 | 4/18/2018 11:54:29 AM | A | PASS |
|
|
BARBARA ###-#### OR ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- 20lb gas pass
|
MEC18-01707
| Pressure Test | 4/17/2018 | 4/18/2018 | 4/18/2018 11:15:52 AM | A | PASS |
|
|
This building is located at the rear of the cemetery on Dawn road Phone #: ###-#### Inspection requested via web by Joe Taylor- 60lb pass from meter location to both unit heaters
|
MEC18-00821
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 10:51:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- final ok
|
MEC18-01703
| Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 10:47:19 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- needs insulation sheild in attic on B vent- dryer vent needs to maintain 4" id and cant be ovaled- pressure test was not ready- left correction notice in front window
|
MEC18-01703
| Pressure Test | 4/17/2018 | 4/18/2018 | 4/18/2018 10:44:34 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- pressure test wasnt ready
|
MEC18-00664
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 10:26:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- final ok
|
MEC17-05780
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 9:49:46 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- scheduled final twice
|
MEC17-05780
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 9:49:11 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- unit 102 needs fresh air vent finished- unit 103 needs transfer grille in dryer/washer closet- left correction notice in front window of 102
|
MEC17-05781
| Final | 4/17/2018 | 4/18/2018 | 4/18/2018 9:47:45 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- unit 104 cracks in drain pan need sealed- left correction notice in front window of 102
|
MEC18-00249
| Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 9:46:04 AM | A | PASS |
|
|
Cover inspection needed for Am on April 18th, 2018. If you have any questions you may contact Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin- seal ok- ok for ceiling tiles
|
MEC18-01145
| Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 8:44:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss- R/I ok
|
MEC18-01647
| Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 8:27:13 AM | A | CANC |
|
|
please call me so can meet to walk job Phone #: ###-#### Inspection rescheduled for afternoon per phone call with Dave
|
MEC17-02368
| Mec-Aging Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 8:16:12 AM | | PEND |
|
|
contractor will try to schedule final per phone call
|
MEC17-02360
| Mec-Aging Inspection | 4/18/2018 | 4/18/2018 | 4/18/2018 8:13:54 AM | | PEND |
|
|
contractor will try to schedule final per phone call
|
MEC17-03612
| Final | 4/17/2018 | 4/18/2018 | 4/17/2018 3:38:02 PM | A | DONE |
|
|
Please call brock 1 hr in advance so he can get you access.
We were under the impression that this was inspected last year. if it did not happen lets get you in to look at the work we did. we apologize for the inconvenience. There was some thought that this was through ada county . sorry for the mix up Phone #: ###-#### Inspection requested via web by Nicholas Paige- this address is in the county- its voided out-
|