ELE01-03617
| Electrical Rough-In | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PART |
|
|
dennis ###-#### r/i --underground ok 4/19/2002 11:56:40 AM
|
ELE02-01032
| Rough-In Permanent Service | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/18/2002 at 13:56:21. Contact: ###-####. contractor called in wrong PM#, and address 4/19/2002 1:35:13 PM
|
ELE02-01123
| Permanent Service | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | NH |
|
|
###-#### called will do in the pm see added inspection 4/19/2002 11:59:23 AM
|
ELE02-01035
| Rough-In Permanent Service | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok no p/s needed 4/19/2002 11:57:29 AM
|
ELE02-01035
| Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 315 On 4/19/2002 11:57:55 AM final for t/i ok
|
ELE02-01123
| Permanent Service | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 315 On 4/19/2002 11:59:45 AM needs cover for sub panel ,label panel , grd within 5ft at u/g waterpipe called 4/19/2002 4:10:52 PM
|
ELE02-00590
| Permanent Service | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
per ser- john ###-#### p/s changed from o/h to u/g
p/s u/g rec. ok 4/19/2002 3:39:41 PM
|
ELE02-01046
| Rough-In Permanent Service | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### r/i & ser r/i ok
p/s o/h new ok 4/19/2002 3:40:09 PM
|
ELE02-00654
| Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
fn -allen ###-#### ok 4/19/2002 2:05:27 PM
|
ELE02-00655
| Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | FAIL |
|
|
allen- ###-#### fn cor. posted called 410.8 clearence fixture in MB closet 4/19/2002 2:24:50 PM
|
ELE02-00749
| Electrical Rough-In | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
r/i- allison- ###-#### ok corrections made 4/19/2002 2:46:24 PM
|