BLD02-00678
| BLD-Final | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | FAIL |
|
|
###-####. need 1hr protection at the top of hood. 4/19/2002 12:28:45 PM
|
BLD01-02612
| BLD-Concrete | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
BUREL ###-#### OR DAVE ###-#### bond beam under door opening. 4/19/2002 12:26:34 PM
|
BLD02-00396
| BLD-Framing/Rough-in | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 08:44:59. Contact: ###-####. c/n posted. 4/19/2002 4:53:51 PM
|
BLD01-02317
| BLD-Framing/Rough-in | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | FAIL |
|
|
###-####. 2x8 "Approved" rafters do not meet minimum 9-1/2 required for an R-30 insulation cavity. Also would need more for an air space . c/n on site. See Section 106.4.3 UBC. 4/19/2002 4:15:07 PM
|
BLD01-01778
| BLD-Footing | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 09:24:19. Contact: ###-####. footing for rv storage. 4/19/2002 4:53:35 PM
|
MIS02-00084
| BLD-Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PART |
|
|
fn calvin ###-####. Ok to skirt, needs landings ele,plm etc for final. 4/19/2002 4:18:09 PM
|
BLD02-00349
| BLD-Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | CANC |
|
|
724-*7845
|