BLD02-00886
| BLD-Framing/Rough-in | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
###-####- brad fr
|
BLD01-00808
| BLD-Framing/Rough-in | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
DARRELL ###-#### grid ok 4/19/2002 10:06:26 AM
|
BLD01-01612
| BLD-Final | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
rex ###-####--fn
|
BLD01-01398
| BLD-Final | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | A | PASS |
|
|
JEFF ###-#### ok for letter of comp after ok from terry records on hillside requirements 4/19/2002 10:46:33 AM
|
BLD02-00847
| BLD-Footing | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | CANC |
|
|
ft robert - ###-####
|
BLD00-01139
| BLD-Final | 4/18/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | NH |
|
|
###-#### ###-#### ###-#### PETE PLEASE CALL FIRST SO HE CAN MEET YOU THERE Scheduled by a contractor via Hello! on 04/18/2002 no ans on phone 4/19/2002 4:47:41 PM
|
BLD00-01139
| BLD-Final | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | NH |
|
|
###-#### ###-#### ###-#### PETE no ans on phone left message 4/19/2002 4:48:03 PM
|
BLD02-00831
| BLD-Footing | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 10:15:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/19/2002 at 11:09:32.
|
BLD02-00612
| BLD-Conference | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 408 On 4/19/2002 2:40:46 PM inadequately supported bearing walls floor joists overspaned elec and plumb not passed cn left on site with more items on site reveiw with contractor required resubmit new plan with details to comply with correction notice
|
MEC02-01061
| Pressure Test | 4/19/2002 | 4/19/2002 | 4/19/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 408 On 4/19/2002 3:05:01 PM
|