BLD03-02287
| FIRE-Sprinkler Rough-in | 4/16/2004 | 4/19/2004 | 4/19/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 1:08:55 PM. Contact: ###-####. See sprinkler FIR permit for details 4/19/2004 3:00:36 PM
|
FIR04-00156
| INSP-Final Inspection | 4/16/2004 | 4/19/2004 | 4/19/2004 12:00:00 AM | A | FAIL |
|
|
We will be there at 8:00am. Ready and Waiting. Jonathan will be on site.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Remote area has changed and will need submittals for calc's; room 6100 is OH and is overspaced; room 6041 is overspaced; room 6018 is overspaced; telephone hallway needs heads installed; evidence room 6109 is OH and is overspaced 4/19/2004 2:59:36 PM
|
FIR04-00114
| INSP-Sprinkler Rough-in/Hydro | 4/16/2004 | 4/19/2004 | 4/19/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/16/2004 at 3:33:16 PM. Contact: ###-####. thrust blocks installed; main still under water at tie-in to UW main 4/19/2004 2:56:52 PM
|
FIR02-00005
| INSP-Sprinkler Rough-in | 4/19/2004 | 4/19/2004 | 4/19/2004 12:00:00 AM | P | PART |
|
|
The 2.5 inch line in area D first floor has shifted from plans and branch lines installed per plans; need EQ at west end of 2.5 inch on first floor as it is overspaced from end of pipe; the tie-ins to exsisting mains aren't completed; okay on first floor area C and D - heads/drops not completed 4/19/2004 3:06:57 PM
|
BLD00-03428
| FIRE-Sprinkler Rough-in | 4/16/2004 | 4/19/2004 | 4/19/2004 12:00:00 AM | P | PART |
|
|
calvin ###-#### See sprinkler FIR for info 4/19/2004 4:07:00 PM
|