ESC07-00315
| BMP Violation | 4/19/2007 | 4/19/2007 | 4/23/2007 2:45:54 PM | P | FAIL |
|
|
Access controls all down on ground, informed rp to install acceptable controls, i.e steel posts and contruction fence, cyclone fence, jersey barriers etc and that stablization is required prior to 30 days from completion per BMC 8-17. Will follow up.
|
ESC07-00090
| Site Preparation | 4/19/2007 | 4/19/2007 | 4/19/2007 2:55:48 PM | P | PART |
|
|
Site looks pretty good, need to containerize trash. Sign is posted.
|
ESC07-00191
| Site Preparation | 4/19/2007 | 4/19/2007 | 4/19/2007 2:54:45 PM | P | PART |
|
|
Thinks look pretty good, verbal comments to rp, need trash container and trash picked up at job site. Minor concrete clean out was done at street.
|
ESC07-00400
| Site Preparation | 4/19/2007 | 4/19/2007 | 4/19/2007 2:07:09 PM | P | PART |
|
|
Overall things are ok, parimeter barrier at curb cut out would be good. Informed RP of comments.
|