BLD06-03087
| BLD-Aging Inspection | 4/19/2007 | 4/19/2007 | 4/25/2007 11:44:21 AM | | PEND |
|
|
Called contractor, he will get a hold of subs to get permits and have them finaled for work that was done. Contractor also noted that Debest fire division is working out details with fire marshall on sprinkler system. Contractor to call me back with updated info.
|
BLD07-00153
| BLD-Aging Inspection | 4/19/2007 | 4/19/2007 | 4/25/2007 11:26:04 AM | | DONE |
|
|
|
BLD06-00940
| BLD-Other | 4/19/2007 | 4/19/2007 | 4/19/2007 4:01:01 PM | P | PASS |
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-00921
| BLD-Other | 4/19/2007 | 4/19/2007 | 4/19/2007 4:00:47 PM | P | PASS |
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-00941
| BLD-Other | 4/19/2007 | 4/19/2007 | 4/19/2007 4:00:28 PM | P | PASS |
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-01621
| BLD-Conference | 4/18/2007 | 4/19/2007 | 4/19/2007 4:00:11 PM | P | PART |
|
|
Observe framing and other MEP rough ins. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Inspected interior framed walls for restrooms on levels 1 to 4. Needs to move one framed wall to achieve 18 inch clearance from door. Also waiting for approved exit enclosure details.
|
BLD06-02950
| BLD-Foundation | 4/18/2007 | 4/19/2007 | 4/19/2007 2:37:57 PM | P | PART |
|
|
gerad; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip. Al reinforcing steel tied in place. Forms for sstemwall were being placed when on site. Area of innspection is North stemwall only.
|
BLD07-00681
| BLD-Energy code compliance | 4/19/2007 | 4/19/2007 | 4/19/2007 1:45:20 PM | P | PASS |
|
|
todd ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD07-00758
| BLD-Other | 4/18/2007 | 4/19/2007 | 4/19/2007 11:36:25 AM | P | CANC |
|
|
Jason stem wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backus Inspection cancelled from web by: Victoria Beall
|
BLD06-02011
| BLD-Final | 4/18/2007 | 4/19/2007 | 4/19/2007 9:46:53 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/18/2007 at 2:22:58 PM. Contact: ###-####. Needs to resolve issues on final aff. with project engineer.
|
BLD06-03294
| BLD-Final | 4/19/2007 | 4/19/2007 | 4/19/2007 9:20:19 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/19/2007 at 7:15:51 AM. Contact: ###-####. All items have been repaired. As per permit, a code enforcement sign off is required. Left message with contractor. Will issue occ. once code enforcement has finaled.
|
BLD06-00921
| BLD-Other | 4/18/2007 | 4/19/2007 | 4/19/2007 9:00:58 AM | A | FAIL |
|
|
kenny - shearing; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-00941
| BLD-Other | 4/18/2007 | 4/19/2007 | 4/19/2007 9:00:38 AM | A | FAIL |
|
|
kenny - shearing; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-00940
| BLD-Other | 4/18/2007 | 4/19/2007 | 4/19/2007 9:00:20 AM | A | FAIL |
|
|
kenny - shearing; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD06-00953
| BLD-Energy code compliance | 4/18/2007 | 4/19/2007 | 4/19/2007 8:46:50 AM | A | PASS |
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|