ELE10-00795
| Final | 4/19/2010 | 4/19/2010 | 4/19/2010 11:29:57 AM | P | CANC |
|
|
inspect as required. Call Dave prior to inspection @###-#### Inspection requested from web by: David Mackey Phone #: ###-#### called no answer needs r/i inspection request before final can be done
|
ELE10-00430
| Final | 4/19/2010 | 4/19/2010 | 4/19/2010 11:25:54 AM | P | PASS |
|
|
Cody (on site) ###-#### Inspection requested from web by: Tracy Robertson Phone #: ###-####
|
ELE10-00697
| Rough-In Permanent Service | 4/19/2010 | 4/19/2010 | 4/19/2010 11:25:36 AM | P | PASS |
|
|
Cody (on site) ###-#### Inspection requested from web by: Tracy Robertson Phone #: ###-#### r/i p/s u/g new ok
|
ELE10-00453
| Electrical Rough-In | 4/16/2010 | 4/19/2010 | 4/19/2010 9:54:12 AM | A | FAIL |
|
|
Carlos-PLease call at least 30 mins prior to inspection Phone #: ###-#### met with owner equip grds cut short, and needs nail-on boxes designed for the job , no screws allowed in plastic boxes note I explained both iteams at time of conference
|
ELE10-00799
| Electrical Rough-In | 4/16/2010 | 4/19/2010 | 4/19/2010 9:21:51 AM | A | PASS |
|
|
lock box code 4910 Inspection requested from web by: Therrin Robertson Phone #: ###-####
|
ELE10-00295
| Final | 4/16/2010 | 4/19/2010 | 4/19/2010 8:14:15 AM | A | PASS |
|
|
Inspection requested from web by: Dan Rohl Phone #: ###-####
|