Inspections for the day of: Friday, April 19, 2013.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00341 Site Preparation4/19/20134/19/20134/23/2013 1:03:35 PM PASS
BLD13-00752 BLD-Final4/18/20134/19/20134/22/2013 10:56:02 AMAPEND
preston Phone #: ###-####
BLD13-00216 BLD-Energy code compliance4/17/20134/19/20134/19/2013 5:24:25 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Kim Winkle
BLD11-02916 BLD-Final4/18/20134/19/20134/19/2013 4:41:33 PMPPASS
requests 4 - Rus Phone #: ###-####
C/C issued.
BLD11-02916 DOC - Permit Finaled4/19/20134/19/20134/19/2013 4:41:08 PMPPASS
GCB13-00039 GCB-Footing4/19/20134/19/20134/19/2013 4:06:31 PMPPART
William ###-#### please call 1/2 hour advance
Partial insp of approx 360 sq ft of structure. location is approx 17' from S. setback (rear) and 5' 6" from W. setback (side).
BLD13-00462 BLD-Footing4/19/20134/19/20134/19/2013 3:06:40 PMPPASS
Chris Phone #: ###-####
ESC13-00202 Site Preparation4/19/20134/19/20134/19/2013 3:05:17 PMPCANC
Dan phone......Called Dan Talked about perimeter protection and clean up.
BLD13-00374 BLD-Energy code compliance4/18/20134/19/20134/19/2013 3:00:01 PMPPASS
Phone #: 8300971 >> Inspection requested via mobile web by rich beaman
BLD13-00308 BLD-Foundation4/18/20134/19/20134/19/2013 2:26:54 PMPPASS
pouring at 1 - chuck Phone #: ###-####
BLD12-01399 BLD-Concrete4/18/20134/19/20134/19/2013 12:03:07 PMACANC
Steve phone
BLD09-00038 BLD-Final4/18/20134/19/20134/19/2013 12:01:52 PMACANC
Travis phone ###-####