BLD13-00629
| FIRE-Final Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 4:59:29 PM | P | PASS |
|
|
life safety passed
|
FIR13-00030
| INSP-Sprinkler Rough-in | 4/19/2013 | 4/19/2013 | 4/19/2013 4:57:54 PM | P | PASS |
|
|
Sprinkler rough-in passed. Baffles are needed between many of the sprinkler heads below the mezzanine since a min. 8'-0" is needed between the heads. Jeff and I discussed options.
|
BLD12-01698
| FIRE-Conference | 4/19/2013 | 4/19/2013 | 4/19/2013 4:55:49 PM | P | DONE |
|
|
darren and I discussed fire extinguisher placement, addressing, facp room signage and emergency lighting
|
FIR13-00071
| INSP-Sprinkler Rough-in/Hydro | 4/19/2013 | 4/19/2013 | 4/19/2013 3:32:15 PM | A | PASS |
|
|
Overhead hydro passed. Rough-in inspection passed for the most part. Need to verify tie-ins to the existing system and verify that flexible cplgs get installed at the wall penatrations.
|
BLD13-00708
| FIRE-Final Inspection | 4/18/2013 | 4/19/2013 | 4/19/2013 3:12:03 PM | P | PASS |
|
|
life safety passed
|
FIR13-00161
| INSP-Final Inspection | 4/18/2013 | 4/19/2013 | 4/19/2013 3:10:25 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00169
| INSP-Final Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 3:09:26 PM | P | PASS |
|
|
permit finaled
|
FIR13-00129
| INSP-Sprinkler Rough-in | 4/19/2013 | 4/19/2013 | 4/19/2013 2:02:08 PM | P | FAIL |
|
|
Suppression system failed to operate the "puff" test. Gas and power did shut off however.
|
BLD13-00650
| FIRE-Final Inspection | 4/19/2013 | 4/19/2013 | 4/19/2013 1:15:52 PM | P | PASS |
|
|
Life safety passed. I found a fire extinguisher on each level near the restrooms.
|
BLD13-00153
| FIRE-Final Inspection | 4/18/2013 | 4/19/2013 | 4/19/2013 12:38:32 PM | A | PASS |
|
|
life safety passed
|
FIR13-00103
| INSP-Sprinkler Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 11:35:21 AM | A | CANC |
|
|
don Phone #: ###-####
|
FIR13-00068
| INSP-Sprinkler Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 10:49:12 AM | A | PASS |
|
|
See the city approved plans for locations marked "ok" in red where sprinkler piping can be covered
|
BLD12-02195
| FIRE-Final Inspection | 4/16/2013 | 4/19/2013 | 4/19/2013 10:01:44 AM | A | FAIL |
|
|
Provide occupant load sign for "75" and mount at the main exit, provide building address of min. 4" of a contrasting color, relocate the ABC fire extinguisher to 75' of all points of the building, repair the emergency lighting in the kitchen area, provide correct remote annunciator for the duct smoke detectors per IMC 606.4.1 ex #2 (did not have audible and visible alarm), hood suppression system did not function.
|
BLD13-00861
| FIRE-Final Inspection | 4/18/2013 | 4/19/2013 | 4/19/2013 9:08:58 AM | A | FAIL |
|
|
Repair the exit sign at the rear exit, provide exit sign at the front exit, provide emergency lighting in the Dining area, provide sticker at the main exit, provide re-certification/annual inspection for the hood suppression system, provide one 2a,10bc fire extinguisher and a K class for the kitchen, provide occupant load sign for "67" at the main exit in the Dining room.
|
BLD13-00902
| FIRE-Final Inspection | 4/18/2013 | 4/19/2013 | 4/19/2013 9:03:47 AM | A | PASS |
|
|
Life safety passed
|