ESC13-00013
| BMP Violation | 4/19/2013 | 4/19/2013 | 4/19/2013 4:04:45 PM | P | FAIL |
|
|
stop work order issued
|
ESC13-00013
| Stop Work Order | 4/19/2013 | 4/19/2013 | 4/19/2013 12:00:00 AM | A | FAIL |
|
|
Only work pertaining to correcting violations may occur. Per RP, drain rock stockpile scheduled to be moved Sat 4/20 and will haul out 200-400 CY of soi on Mon 4/22l. Will need to install ESC measures and stabilized exit prior to lifting SWO
|