ELE16-00506
| Electrical Rough-In | 4/19/2016 | 4/19/2016 | 4/19/2016 1:59:26 PM | P | PASS |
|
|
We are requesting a main electrical underground inspection for the electrical room for this afternoon. Our contacts are Tony @ ###-#### or Bobby @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate r/i ok continue underslab up to electrical room
|
ELE16-00870
| Final | 4/19/2016 | 4/19/2016 | 4/19/2016 1:33:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Celinda Winters final ok
|
ELE15-01348
| Rough-In Permanent Service | 4/19/2016 | 4/19/2016 | 4/19/2016 1:05:09 PM | P | CANC |
|
|
MSSC , MSSD and associated transformers Phone #: ###-#### Inspection requested via web by Tom Betty needed p/s only
|
ELE15-01348
| Permanent Service | 4/19/2016 | 4/19/2016 | 4/19/2016 1:03:45 PM | P | PASS |
|
|
MSSC , MSSD and associated transformers Phone #: ###-#### Inspection requested via web by Tom Betty doors are lockable with signage posted, available fault current labeled and lockoffs present on all breakers not ready for energizing. p/s u/g n ok
|
ELE16-00167
| Final | 4/18/2016 | 4/19/2016 | 4/19/2016 11:19:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk final ok 9005 and 9011
|
ELE13-01783
| ELE-Aging Inspection | 4/19/2016 | 4/19/2016 | 4/19/2016 10:10:45 AM | | PASS |
|
|
final ok
|
ELE13-01783
| Electrical Rough-In | 4/19/2016 | 4/19/2016 | 4/19/2016 10:10:21 AM | P | PASS |
|
|
r/i ok sign ul listed and disconnect present
|
ELE16-01166
| Rough-In Permanent Service | 4/18/2016 | 4/19/2016 | 4/19/2016 8:42:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake r/i ok p/s u/g rec ok NOTE: existing meter pack needs 100amp 1phase meter
|
ELE16-01207
| Electrical Rough-In | 4/18/2016 | 4/19/2016 | 4/19/2016 8:17:04 AM | A | PASS |
|
|
Underground // John Phone #: ###-#### r/i ok u.ground telco and sign feed from bldg to the east pedestal and sign
|
ELE16-01206
| Final | 4/15/2016 | 4/19/2016 | 4/19/2016 7:54:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Harvey Reyna final ok
|
ELE16-01206
| Electrical Rough-In | 4/19/2016 | 4/19/2016 | 4/19/2016 7:54:10 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Harvey Reyna r/i ok relocate lights and switching
|
ELE16-01134
| Conference | 4/18/2016 | 4/19/2016 | 4/19/2016 12:00:00 AM | A | DONE |
|
|
We are requesting a service grounding conference on the main service. Our contact is Tony @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate discuss concrete encased electrode for MSB and transformer in main electrical room
|