Inspections for the day of: Tuesday, April 19, 2016.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00339 General Inspection4/19/20164/19/20164/19/2016 4:21:46 PM PASS
WIP. No sediment runoff. Slab for warehouse is complete, concrete washout contained. No trackout from site entrances. Approved.
ESC15-00659 General Inspection4/19/20164/19/20164/19/2016 3:56:10 PM PASS
ESC14-00432 General Inspection4/19/20164/19/20164/19/2016 3:17:20 PMPPART
No sediment control issues or stormwater pollution. BMPs include inlet protection and trash containment. Vegetative buffer around creek has been maintained.

Correction request:
- post City of Boise ESC sign on SWPPP board
- post City of Boise ESC signs on all all active projects in the foundation phase.

Hayden Homes is building all homes and has same RP Tom Lane
ESC15-01411 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:57:30 PMPPASS
Home complete, lanscaped, and loose sediment cleaned. No temp BMP removal required.
ESC15-00559 Aging Inspection4/19/20164/19/20164/19/2016 2:55:27 PM PASS
Foundation and footprint of home addition is complete. Surrounding area has revegetated and no loose dirt or stockpiles onsite. BLD open for interior and final finishes. No further ESC inspections necessary, permit conditions satisfied.
ESC15-00559 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:51:36 PMPPASS
ESC15-01620 General Inspection4/19/20164/19/20164/19/2016 2:47:14 PMPPASS
WIP on commercail building. No trackout, material spills, or discharges at site. Perimeter BMPs and inlet protection are installed.
ESC15-00544 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:45:08 PMPPASS
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
ESC15-01626 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:44:59 PMPPASS
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
ESC15-00545 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:44:38 PMPPASS
This building at Union Square commercial development is complete. Active sites within complete. No ESC violations or outstanding issues. No further inspections required. ESC15-01619 and -01620 are open.
ESC13-01279 General Inspection4/19/20164/19/20164/19/2016 2:08:57 PM PASS
WIP on homes on the east side of Caddis and south of Mill Station. No trackout, loose sediment, or other debris/materials on roadways & gutters. DIs have sediment filter bags that have been maintained regularly. No concrete work occuring at this time, only framing. Will need to re-line the concrete washout pits when new foundations are to begin.

Subdivision is clean, no corrections at this time.
ESC15-00528 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:05:37 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-00529 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:05:06 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-00530 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:04:47 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-00526 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:04:18 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-00524 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:03:33 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-00525 DOC - Permit Finaled4/19/20164/19/20164/19/2016 2:03:00 PMPPASS
Home complete, landscaped and stabilized. Active projects in Harris Crossing so temp BMPs to remain installed. Subdivision currently in compliance.
ESC15-01434 Site Preparation4/19/20164/19/20164/19/2016 1:52:59 PMPPASS
Clint Phone #: ###-####

Permit sign posted. Lined concrete washout for Tahoe Homes is located off alley between Shadywood & Brook Ridge, just south of Wolf Tree. DIs have sediment filter bags installed. Active projects in compliance. Approved.
ESC15-01369 BMP Violation4/18/20164/19/20164/19/2016 10:45:57 AMPPART
Some sweep up of apron on east side of circle has been completed. Significant amount of dirt left in gutter.

John Brown excavator, called yesterday sweeping was complete. Job was only partially swept. No DI sediment control installed.

Verbal correction request to Mark Goldy to finish sweeping and install sediment control to prevent loose material from entering storm drain.

Will check back early next week.
ESC15-00557 Aging Inspection4/19/20164/19/20164/19/2016 10:06:00 AM PASS
Demolition/re-build on existing frame is in progress. No activity at time of inspection. Site is fenced off. No sediment runoff or other issues.
ESC16-00178 Site Preparation4/18/20164/19/20164/19/2016 9:49:35 AMAPASS
Troy Phone #: ###-####

Approved for construction. Initial BMPs on site. RP and foreman familiar with ESC conditions. Requested to weigh down/contain trash to prevent wind blowing it in to neighboring homes and foothills open space.
ESC15-00350 General Inspection4/19/20164/19/20164/19/2016 9:20:07 AM PASS
staging yard no longer in active use. Lot is back to pre-construction conditions of gravel and dirt. Will check to see if ROW will resume this summer; new 2016 permit may be required.
ESC15-00660 General Inspection4/19/20164/19/20164/19/2016 8:32:12 AM PASS