ELE17-01654
| ELE-Aging Inspection | 4/19/2019 | 4/19/2019 | 4/24/2019 2:06:08 PM | | PASS |
|
|
ARC fault protected smoke detector was added in mstr bed.
|
ELE19-01190
| Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 1:58:59 PM | P | PASS |
|
|
Rough in Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover level up the stairs on left.
|
ELE19-01061
| Electrical Rough-In | 4/19/2019 | 4/19/2019 | 4/19/2019 1:01:41 PM | P | PASS |
|
|
Unit B rough-in ok to cover Ok cover B unit.
|
ELE19-01324
| Temporary Service | 4/19/2019 | 4/19/2019 | 4/19/2019 12:22:19 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman t/s u/g n ok
|
ELE19-01410
| Conference | 4/18/2019 | 4/19/2019 | 4/19/2019 12:03:15 PM | A | DONE |
|
|
Commercial remodel power/lighting Phone #: ###-#### Inspection requested via web by jamie berg Discussed outlet requirement for meeting room, and possible redundant if needed for other locations. Does not think there is going to be any evasive procedures in room locations.
|
MIS19-00100
| ELE-Conference | 4/18/2019 | 4/19/2019 | 4/19/2019 10:54:00 AM | A | DONE |
|
|
Nick the property owner was on-site. He said only the outside was being worked on at this time. He has plumbing and electrical contractors showing up today around 1 pm to look at the job. Unauthorized persons were living here before. He said permits will be pulled for project.
|
ELE19-01065
| Permanent Service | 4/17/2019 | 4/19/2019 | 4/19/2019 9:47:45 AM | A | PASS |
|
|
Call Darren with any questions at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan 2 grd rods. p/s o/h n ok
|
ELE19-01281
| Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 9:47:18 AM | A | PASS |
|
|
listing inspection for solar equipment. roof top crew will be there from 8 to noon; equipment readily available for inspection and roof top attachment points easy to see. Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King All items UL listed.
|
ELE17-01606
| ELE-Aging Inspection | 4/19/2019 | 4/19/2019 | 4/19/2019 9:02:20 AM | | DONE |
|
|
Spoke with contractor. He is going to check on it in the next couple of days and call in for a final.
|