PLM01-00810
| Other | 3/30/2001 | 4/2/2001 | 4/2/2001 12:00:00 AM | A | NR |
|
|
Scheduled by Inspector: 330 On 3/30/2001 3:32:17 PM ###-#### marie 3/30/2001 3:32:48 PM
|
PLM01-00399
| Plumbing Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 12:00:00 AM | P | PART |
|
|
around 2:00 if possible sabrina ###-#### sewer sewer main south side 4/2/2001 3:10:53 PM
|
PLM01-00362
| Final | 4/2/2001 | 4/2/2001 | 4/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 09:48:19. Contact: ###-####.
|
PLM01-00860
| Sprinkler (Final) | 4/2/2001 | 4/2/2001 | 4/2/2001 12:00:00 AM | P | PASS |
|
|
marcy ###-#### reinspection
|
PLM01-00861
| Sprinkler (Final) | 4/2/2001 | 4/2/2001 | 4/2/2001 12:00:00 AM | P | PASS |
|
|
marcy reinspection ###-####
|