Inspections for the day of: Tuesday, April 2, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01268 BLD-Final3/29/20024/2/20024/2/2002 12:00:00 AMAPASS
###-#### bryan final ok pending p&z sign off. 4/2/2002 8:48:19 AM
BLD01-00645 BLD-Framing/Rough-in4/1/20024/2/20024/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/01/2002 at 08:29:21. Contact: ###-####. 2nd and third floor ok to insulate/ fire stop pipe hangers/ one ceilling patch and dryer vent framing protectin. 4/2/2002 10:17:12 AM
BLD01-00964 BLD-Conference4/1/20024/2/20024/2/2002 12:00:00 AMAFAIL
###-#### c/n isued. 4/2/2002 4:07:44 PM
BLD02-00725 BLD-Conference4/1/20024/2/20024/2/2002 12:00:00 AMAPASS
ALDEN ###-####
BLD02-00557 BLD-Foundation4/1/20024/2/20024/2/2002 12:00:00 AMAPASS
travis ###-#### found
BLD02-00225 BLD-Framing/Rough-in4/1/20024/2/20024/2/2002 12:00:00 AMAPART
justin--- ###-#### -fr framing ok need gas test to pass . 4/2/2002 8:59:31 AM
MEC02-00488 Pressure Test4/2/20024/2/20024/2/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/02/2002 at 09:12:45. Contact: ###-####.
MEC02-00488 Pressure Test4/2/20024/2/20024/2/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 04/02/2002 at 09:12:45. Contact: ###-####.
BLD01-02547 BLD-Other4/2/20024/2/20024/2/2002 12:00:00 AMPFAIL
FOR STAIRWAY-- MISTY ###-#### FOR STAIRWAY-- head room 1003.3.4 6'8" min 4/2/2002 4:18:00 PM