BLD01-01268
| BLD-Final | 3/29/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PASS |
|
|
###-#### bryan final ok pending p&z sign off. 4/2/2002 8:48:19 AM
|
BLD01-00645
| BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 08:29:21. Contact: ###-####. 2nd and third floor ok to insulate/ fire stop pipe hangers/ one ceilling patch and dryer vent framing protectin. 4/2/2002 10:17:12 AM
|
BLD01-00964
| BLD-Conference | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | FAIL |
|
|
###-#### c/n isued. 4/2/2002 4:07:44 PM
|
BLD02-00725
| BLD-Conference | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PASS |
|
|
ALDEN ###-####
|
BLD02-00557
| BLD-Foundation | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PASS |
|
|
travis ###-#### found
|
BLD02-00225
| BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PART |
|
|
justin--- ###-#### -fr framing ok need gas test to pass . 4/2/2002 8:59:31 AM
|
MEC02-00488
| Pressure Test | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 09:12:45. Contact: ###-####.
|
MEC02-00488
| Pressure Test | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 09:12:45. Contact: ###-####.
|
BLD01-02547
| BLD-Other | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | FAIL |
|
|
FOR STAIRWAY-- MISTY ###-#### FOR STAIRWAY-- head room 1003.3.4 6'8" min 4/2/2002 4:18:00 PM
|