BLD01-00896
| BLD-Conference | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PASS |
|
|
###-#### BILL; will try to activate hvac for final...& address other issues for final; ok to keep permit open 4/2/2002 10:45:21 AM
|
BLD01-03251
| BLD-Footing | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 12:14:38. Contact: ###-####. ftg / drain assy ok; setbacks ok per plan; proposed ice block type fdn/bsmt...told owner to recall when ready to pour. 4/2/2002 2:43:50 PM
|
BLD01-02565
| BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PART |
|
|
john ###-#### fr insp ; complete shear repair at fireplace area (int. wall)
(4/2/2002 9:08:52 AM 4/2/2002 10:09:33 AM
|
BLD02-00231
| BLD-Conference | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/2/2002 11:16:05 AM w/ framer at site...add 1hr const at floor lines & property line walls at "offset" at front of bldg...no ladder partition backing at 1hr walls (unless gyp runs thru); needs 1hr wall inspection for 2nd fl...chk. for dbl 1hr at attic.
|
BLD98-03705
| BLD-Conference | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/2/2002 4:17:16 PM rec'd soils & concrete tests re wall const & backfill, wip
|
BLD01-03017
| BLD-Final | 3/29/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | FAIL |
|
|
###-#### EARLY PM? c/n, thresholds, firestops at alley, closer,seal at demising door, signage...ok for t/o. 4/2/2002 2:45:07 PM
|
BLD01-00596
| BLD-Final | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 09:25:54. Contact: ###-####.
|
BLD01-00604
| BLD-Final | 4/2/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 09:27:58. Contact: ###-####.
|
BLD02-00231
| BLD-Framing/Rough-in | 4/1/2002 | 4/2/2002 | 4/2/2002 12:00:00 AM | P | PART |
|
|
clyde -###-#### 2nd fl inner layers of dbl 1hr walls ok to plate line...recall for attic separation insp 4/2/2002 4:55:06 PM
|