BLD02-00369
| BLD-Framing/Rough-in | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PART |
|
|
###-#### randuy; w/ Robb, eng'r & Leighton (framer) re wall details, insps, & order of assembly 4/2/2003 5:02:09 PM
|
BLD03-00411
| BLD-Foundation | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 9:33:03 PM. Contact: ###-####...steel in, chk hds at frame. 4/2/2003 4:55:44 PM
|
BLD03-00201
| BLD-Conference | 4/2/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PASS |
|
|
w/ RM Mech re hvac at corridor 4/2/2003 4:59:16 PM
|
BLD95-00237
| BLD-Final | 4/2/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | P | NR |
|
|
final inspection per George S. call first Freddy ###-####. need other insps 1st 4/2/2003 4:58:28 PM
|