BLD02-00483
| BLD-Aging Inspection | 4/2/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | | PART |
|
|
called ###-#### and informed him that thiswork to be completed ASAP; he will get with the owners/occupants and finish the work 4/7/2003 9:04:04 AM
|
FIR01-00626
| INSP-Conference | 4/2/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PART |
|
|
met with Jim thrasher and told him that the permit is ready for pick up and the work must be completed; he said he had the check ready on his desk and that he has the generator and LP tank ready to install; he said he would get going on it; I informed him that actions such as pre-citation and citations will be issued if the work isn't completed as soon as possible
|
FIR03-00061
| INSP-Final Inspection | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | FAIL |
|
|
need spare heads and hanger for armover 4/2/2003 12:34:49 PM
|
FIR02-00454
| INSP-Final Inspection | 3/24/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | P | PART |
|
|
1 pm ###-#### completed flow test of standpipe on 10th floor - 2.5 inch orifice with 9 psi pitot and 109 psi residual - acceptable and awaiting basement plan per Bill Alexander 4/2/2003 3:23:39 PM
|