FIR03-00124
| INSP-Sprinkler Rough-in/Hydro | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PASS |
|
|
###-#### jim Sprinklers are ok to cover 4/2/2003 1:31:08 PM
|
FIR02-00359
| INSP-Conference | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | DONE |
|
|
mark; Phone #: ###-#### Discussed the placement of the remote annunciator and placement of duct smoke detectors. I gave Jim permission to cover the sprinkler piping in the old print room on the east side 1st floor 4/2/2003 9:28:11 AM
|
BLD02-00242
| FIRE-Final Inspection | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### No approved plans on site 4/2/2003 3:01:26 PM
|
MIS02-00010
| FIR-Final | 4/2/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PASS |
|
|
fire alarm and fire life safety finaled
|
FIR03-00036
| INSP-Alarm Testing | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 7:37:08 AM. Contact: ###-####.
|
FIR02-00032
| INSP-Final Inspection | 4/1/2003 | 4/2/2003 | 4/2/2003 12:00:00 AM | P | FAIL |
|
|
Call first Phil - ###-#### Most of the a/v's are overspaced and will need brighter ones or additional a/v's. We tested all of the duct detectors, one fire smoke damper, manual pulls and the single smoke detector. Still need to verify standby battery supply and all a/v's. 4/2/2003 3:49:00 PM
|