PLM04-00748
| Final | 4/1/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | A | PART |
|
|
LIAM HINDE, #515, MSTI ACCELERATOR #2; Phone #: ###-#### Internet Inspection Request from: Pam Masselli everything is tested and ready to go, gary needs to see drain on rp by heat exchanger. temp occ ok 4/2/2004 10:40:12 AM
|
PLM04-00390
| Water and/or Sewer | 4/1/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | A | PASS |
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Darla Downs sw final ok this is for the sewer and water service from where they left off 80' from the road to the building. 4/2/2004 8:51:27 AM
|
PLM04-00728
| Groundwork | 4/1/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/1/2004 at 5:23:52 PM. Contact: ###-####. gw ok 4/2/2004 9:26:49 AM
|
PLM03-03288
| Water and/or Sewer | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | A | PASS |
|
|
this is a final 4/2/2004 11:36:46 AM
|
PLM03-03288
| Final | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | A | PASS |
|
|
final ok
|
PLM04-00635
| Water and/or Sewer | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | P | PART |
|
|
mike ###-#### 1st building sewer ok needs test, monday bld #2 4/2/2004 2:48:52 PM
|
PLM04-00744
| Groundwork | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Sonja Hankel gw ok 4/2/2004 1:56:43 PM
|
PLM04-00290
| Final | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | P | PASS |
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes final ok 4/2/2004 2:05:33 PM
|
PLM04-00753
| Plumbing Rough-in | 4/2/2004 | 4/2/2004 | 4/2/2004 12:00:00 AM | P | PASS |
|
|
###-#### Craig ri ok with tub trap arm over fireplace hung 4/2/2004 2:17:21 PM
|