Inspections for the day of: Monday, April 2, 2007.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02787 FIRE-Alarm Testing3/30/20074/2/20074/3/2007 4:44:06 PMPPART
Room 106 is acceptable for occupancy, permit final pending completion of the remainder of the scope of work.
FIR06-00101 INSP-Final Inspection4/2/20074/2/20074/3/2007 4:42:26 PMPPASS
Required corrections have been verified for compliance, final fire sprinkler inspection passed, permit finaled.
FIR06-00523 INSP-Alarm Testing4/2/20074/2/20074/2/2007 2:33:17 PMPFAIL
See comments per inspection completed by M. Timmerman.
BLD07-00673 FIRE-Conference3/30/20074/2/20074/2/2007 2:30:15 PMADONE
On site visit to determine requirements for project related fire sprinkler modifications and permit work.
FIR06-00897 INSP-Sprinkler Rough-in/Hydro3/30/20074/2/20074/2/2007 2:25:36 PMAFAIL
OH hydrostatic test of the antifreeze system failed due to visible leakage at the system piping, OH hydro test of the wet system failed due to pressure drop at the guage below 200psi.
FIR06-00101 INSP-Sprinkler Rough-in/Hydro4/2/20074/2/20074/2/2007 12:00:00 AMPCANC
johnathan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall