PLM08-00160
| Other | 4/2/2008 | 4/2/2008 | 4/2/2008 4:17:17 PM | P | PART |
|
|
ground work on new addition replumbed to make grade on existing sewer line test ok . sewer line from new addition and grease interceptor to point of connection correction made on bedding of pipe and adjusting grade ok. done by Buss mechanical apex excavation repiped existing sewer line from cloverdale 94 feet up to point of connection to new sewer line from addition with out inspection . BEN ( Petra job foreman) in our conversation over phone did not want apex excavation back on job had buss mechanical pot hole sewer line in three location,s to check material and grade and test sewer line. test ok
|
PLM08-00574
| Final | 4/2/2008 | 4/2/2008 | 4/2/2008 3:36:37 PM | P | CANC |
|
|
early pm please - added 2 lavs, 1 shower, 1 wc Phone #: ###-#### Internet Inspection Request from: fritz ramisch
|
PLM08-00574
| Plumbing Rough-in | 4/2/2008 | 4/2/2008 | 4/2/2008 3:36:21 PM | P | PART |
|
|
under floor rough-in for phase 2 new addition test ok contractor to recall when top out rough-in is ready
|
PLM08-00599
| Water Heater Final | 4/2/2008 | 4/2/2008 | 4/2/2008 3:32:58 PM | P | PASS |
|
|
call home owner at ###-#### before inspection. unit 31
|
PLM08-00552
| Plumbing Rough-in | 4/1/2008 | 4/2/2008 | 4/2/2008 2:21:51 PM | P | PASS |
|
|
Please call Russell with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM08-00662
| Groundwork | 4/1/2008 | 4/2/2008 | 4/2/2008 11:23:35 AM | A | PASS |
|
|
Please call Johnny ###-#### 1/2 hour prior to arrival. He will meet you there Phone #: ###-#### Internet Inspection Request from: Colleen Brown
|