Inspections for the day of: Thursday, April 2, 2009.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS09-00048 PLM-Conference3/26/20093/26/2009 P 
PLM09-00362 Other4/1/20094/2/20094/2/2009 4:09:36 PMAPART
correction notice
PLM09-00388 Sprinkler (Final)4/2/20094/2/20094/2/2009 3:30:02 PMPPART
sprinkler heads are placed below flood level of storm drainage system, this changes the degree of hazard for the backflow device installed on system. dbca needs to be replaced with a rpba.
PLM08-01792 Other4/2/20094/2/20094/2/2009 3:18:19 PMPPART
this was a walk-thru with plumber.
PLM09-00427 Med/Gas Systems4/2/20094/2/20094/2/2009 2:23:28 PMPPART
in slab vacuum pass
PLM09-00423 Water and/or Sewer4/2/20094/2/20094/2/2009 2:20:25 PMPNR
ESC09-00031 General Inspection4/1/20094/2/20094/2/2009 2:14:33 PMAPART
Clean up occuring when needed. Site is not in bad shape.
PLM09-00431 Plumbing Rough-in4/1/20094/2/20094/2/2009 10:52:03 AMAPART
Scheduled by a contractor via Hello! on 4/1/2009 at 2:56:52 PM. Contact: ###-####.need duel drain on washer for softner drain, dwv & water test pass.
ESC07-01166 Site Preparation4/1/20094/2/20094/2/2009 10:45:41 AMAPASS
PLM09-00443 Plumbing Rough-in4/1/20094/2/20094/2/2009 9:51:26 AMAPART
Spencer- call 30 mins prior to going Phone #: ###-####-need to test dwv & finish water.
PLM09-00427 Med/Gas Systems4/1/20094/2/20094/2/2009 9:07:47 AMAPART