Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00186 INSP-Conference4/2/20104/2/20104/2/2010 3:00:59 PMPDONE
spoke to eric on procedure for fire inspection
BLD10-00395 FIRE-Conference4/2/20104/2/20104/2/2010 1:40:39 PMPDONE
I spoke to Jerry Mcadams about the status of the project based on the last time I was there. I do not recall performing any inspections to verify that the insulation issues had been addressed.
BLD10-00228 FIRE-Conference4/2/20104/2/20104/2/2010 1:17:27 PMPPASS
I spoke to the owner/builder and clarified the requirements for the fire extinguisher located at the paint hood.
BLD10-00552 FIRE-Conference4/2/20104/2/20104/2/2010 1:16:41 PMPDONE
I spoke to Mike Jordan about Tim Woodard and I's discussion on the occupancy change and the new requirements for an exit sign/emergency light at the southeast door and the occupant load changing from 40 to 120.
FIR09-00175 INSP-Sprinkler Rough-in/Hydro4/1/20104/2/20104/2/2010 1:13:25 PMPFAIL
We verified the Netcon rating at the beginning of the inspection and found that it got only a 6. U.L. listing is for a 5 or less. No other items inspected.
FIR09-00173 INSP-Final Inspection4/1/20104/2/20104/2/2010 1:13:08 PMPFAIL
We verified the Netcon rating at the beginning of the inspection and found that it got only a 6. U.L. listing is for a 5 or less. No other items inspected.
FIR06-00302 INSP-Final Inspection4/2/20104/2/20104/2/2010 11:49:16 AMPPASS
Permit finaled
BLD10-00552 FIRE-Final Inspection4/1/20104/2/20104/2/2010 9:48:51 AMAPASS
life safety passed
BLD10-00418 FIRE-Final Inspection4/1/20104/2/20104/2/2010 9:33:20 AMANR
Tim Frost sent email request for status of project.