FIR08-00186
| INSP-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 3:00:59 PM | P | DONE |
|
|
spoke to eric on procedure for fire inspection
|
BLD10-00395
| FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 1:40:39 PM | P | DONE |
|
|
I spoke to Jerry Mcadams about the status of the project based on the last time I was there. I do not recall performing any inspections to verify that the insulation issues had been addressed.
|
BLD10-00228
| FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 1:17:27 PM | P | PASS |
|
|
I spoke to the owner/builder and clarified the requirements for the fire extinguisher located at the paint hood.
|
BLD10-00552
| FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 1:16:41 PM | P | DONE |
|
|
I spoke to Mike Jordan about Tim Woodard and I's discussion on the occupancy change and the new requirements for an exit sign/emergency light at the southeast door and the occupant load changing from 40 to 120.
|
FIR09-00175
| INSP-Sprinkler Rough-in/Hydro | 4/1/2010 | 4/2/2010 | 4/2/2010 1:13:25 PM | P | FAIL |
|
|
We verified the Netcon rating at the beginning of the inspection and found that it got only a 6. U.L. listing is for a 5 or less. No other items inspected.
|
FIR09-00173
| INSP-Final Inspection | 4/1/2010 | 4/2/2010 | 4/2/2010 1:13:08 PM | P | FAIL |
|
|
We verified the Netcon rating at the beginning of the inspection and found that it got only a 6. U.L. listing is for a 5 or less. No other items inspected.
|
FIR06-00302
| INSP-Final Inspection | 4/2/2010 | 4/2/2010 | 4/2/2010 11:49:16 AM | P | PASS |
|
|
Permit finaled
|
BLD10-00552
| FIRE-Final Inspection | 4/1/2010 | 4/2/2010 | 4/2/2010 9:48:51 AM | A | PASS |
|
|
life safety passed
|
BLD10-00418
| FIRE-Final Inspection | 4/1/2010 | 4/2/2010 | 4/2/2010 9:33:20 AM | A | NR |
|
|
Tim Frost sent email request for status of project.
|