BLD08-00870
| FIRE-Conference | 3/14/2012 | 3/28/2012 | | A | |
|
|
Please check on this and let Barb @ permit desk know status-want to try to close out permit-Thanks
|
BLD10-00997
| FIRE-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 3:41:27 PM | P | DONE |
|
|
I spoke to mike about getting a life safety final on this project.
|
BLD12-00221
| FIRE-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 3:33:17 PM | P | DONE |
|
|
I spoke to Mike about getting a life safety inspection completed for BLD10-00997 which is related to this project.
|
FIR12-00127
| INSP-Sprinkler Rough-in | 4/2/2012 | 4/2/2012 | 4/2/2012 3:32:18 PM | P | CANC |
|
|
duplicate inspection
|
BLD11-03036
| FIRE-Conference | 4/2/2012 | 4/2/2012 | 4/2/2012 3:31:48 PM | P | DONE |
|
|
I found a roof penatration (3'x3') that has been blocked off. This penatration is not shown on the city approved plans. I requested a responce from the engineer, who designed changes to the smoke evac system for this project, too provide verification that the smoke evac. system is not effected by blocking this penatration.
|
FIR12-00127
| INSP-Final Inspection | 4/2/2012 | 4/2/2012 | 4/2/2012 3:21:33 PM | P | FAIL |
|
|
Three upright sprinkler heads are painted/covered over the sales floor, two esch. are missing at the main exit, sprinkler protection needs to be provided in the empty spaced created by the new tenant demizing wall as discussed.
|
FIR12-00134
| INSP-Final Inspection | 4/2/2012 | 4/2/2012 | 4/2/2012 3:20:59 PM | P | FAIL |
|
|
Three upright sprinkler heads are painted/covered over the sales floor, two esch. are missing at the main exit, sprinkler protection needs to be provided in the empty spaced created by the new tenant demizing wall as discussed.
|
BLD12-00668
| FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 3:18:36 PM | P | FAIL |
|
|
Provide information on the storage and use of flammable and combustible liquids to the plan reviewer. See IFC 2211.2, Provide sources of ignition that are located less than 18". See IFC 2211.3, Relocate the fire extinguisher to within 30' of all points in space.
|
BLD08-00986
| FIRE-Final Inspection | 4/2/2012 | 4/2/2012 | 4/2/2012 3:00:12 PM | P | PASS |
|
|
Life safety passed. The builder has installed "tabs" on the lower leaf to operate the upper leaf as a single unit.
|
BLD12-00172
| FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 10:38:47 AM | A | PASS |
|
|
Life safety passed.
|
BLD12-00293
| FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 9:21:43 AM | A | PASS |
|
|
Life safety passed
|