MIS13-00072
| FIR-Conference | 3/27/2013 | 3/27/2013 | | P | |
|
|
waiting on Stephanie to check documents
|
FIR12-00737
| FIR-Aging Inspection | 4/2/2013 | 4/2/2013 | 4/10/2013 3:25:00 PM | | NR |
|
|
wip
|
FIR12-00001
| FIR-Aging Inspection | 4/2/2013 | 4/2/2013 | 4/10/2013 7:30:33 AM | | NR |
|
|
Rick was going to follow up on job status.
|
FIR12-00685
| FIR-Aging Inspection | 4/2/2013 | 4/2/2013 | 4/3/2013 7:19:55 AM | | NR |
|
|
Work is in progress
|
BLD12-03082
| FIRE-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 3:53:55 PM | P | PASS |
|
|
Life safety passed
|
BLD13-00725
| FIRE-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 2:59:38 PM | P | FAIL |
|
|
Two pendant heads are overspaced off of the north wall in the Retail area. A temporary occupancy will be ok when the sprinkler contractor has submitted for approval.
|
BLD11-01875
| FIRE-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 2:49:03 PM | P | FAIL |
|
|
Provide accessible hardware on the new doors as per the approved plans. Repair the exit signs as discussed.
|
FIR12-00574
| INSP-Sprinkler Rough-in/Hydro | 4/1/2013 | 4/2/2013 | 4/2/2013 2:35:13 PM | P | PASS |
|
|
The oh hydro of the 4" riser/steim passed. The 24 hour air test of the dry system was startedat 12:00 with 44psi on the guage. Previous correction items in the shop areas have been corrected.
|
BLD12-01975
| FIRE-Final Inspection | 4/1/2013 | 4/2/2013 | 4/2/2013 1:52:07 PM | P | PASS |
|
|
life safety passed
|
BLD13-00652
| FIRE-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 1:44:31 PM | P | FAIL |
|
|
Repair the two emergency lights. All other items appear ok.
|
FIR13-00109
| INSP-Supply line flush | 4/2/2013 | 4/2/2013 | 4/2/2013 1:06:21 PM | P | PASS |
|
|
This is an ug flush.
|
FIR12-00717
| INSP-Sprinkler Rough-in | 4/1/2013 | 4/2/2013 | 4/2/2013 12:57:52 PM | A | PASS |
|
|
See the city approved plans for location where the sprinkler piping can be covered
|
FIR13-00108
| INSP-Supply line flush | 4/2/2013 | 4/2/2013 | 4/2/2013 12:54:51 PM | P | PASS |
|
|
Thi is an ug flush.
|
FIR13-00107
| INSP-Supply line flush | 4/2/2013 | 4/2/2013 | 4/2/2013 12:53:25 PM | P | PASS |
|
|
This is an ug flush.
|
FIR13-00094
| INSP-Final Inspection | 4/1/2013 | 4/2/2013 | 4/2/2013 10:04:31 AM | A | FAIL |
|
|
I noted that the candella had been changed on several devices and an additional devices need to be provided in the conference room and the break room. No testing was done. As-builts will be needed showing the additional/changes of the devices.
|
FIR13-00047
| INSP-Final Inspection | 4/1/2013 | 4/2/2013 | 4/2/2013 10:02:32 AM | A | PASS |
|
|
Permit finaled
|