FIR13-00611
| INSP-Sprinkler Rough-in | 4/2/2014 | 4/2/2014 | 4/2/2014 4:34:08 PM | P | PART |
|
|
Okay to cover remainder. Coverage adjustments verified.
|
FIR14-00108
| INSP-Sprinkler Rough-in/Hydro | 4/1/2014 | 4/2/2014 | 4/2/2014 4:00:19 PM | P | PART |
|
|
Overhead hydrostatic test of the new 4" and 6" mains completed satisfactory.
|
FIR14-00148
| INSP-Sprinkler Rough-in/Hydro | 4/1/2014 | 4/2/2014 | 4/2/2014 3:58:35 PM | P | PART |
|
|
Overhead hydrostatic retest passed, verified previous correction items. Final pending project finishes and trade related work.
|
BLD13-01048
| FIRE-Sprinkler Rough-in | 4/2/2014 | 4/2/2014 | 4/2/2014 11:15:32 AM | A | PART |
|
|
Regarding coverage at closets with HVAC equipment per NFPA 13R, discussed cold cavity protection.
|
FIR11-00052
| INSP-Final Inspection | 4/2/2014 | 4/2/2014 | 4/2/2014 10:26:59 AM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR13-00631
| INSP-Final Inspection | 4/2/2014 | 4/2/2014 | 4/2/2014 10:20:30 AM | A | PASS |
|
|
Fire sprinkler permit finaled- Ref. activity notes
|