ELE15-00508
| Electrical Rough-In | 4/2/2015 | 4/2/2015 | 4/2/2015 2:47:35 PM | P | PASS |
|
|
Please give me half an hour notice to insure someone is there to let you in. Please inspect bar counter top heat. Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Island upper level counter top heat rough in ok cover
|
ELE15-00837
| Permanent Service | 3/31/2015 | 4/2/2015 | 4/2/2015 1:40:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell p/s u/g rec ok
|
ELE15-00837
| Electrical Rough-In | 4/2/2015 | 4/2/2015 | 4/2/2015 1:38:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Craig Korell Hot tub underground rough in ok cover
|
ELE15-00864
| Rough-In Permanent Service | 4/1/2015 | 4/2/2015 | 4/2/2015 1:06:47 PM | P | PASS |
|
|
Will be ready by noon, Phone #: ###-#### Inspection requested via web by Andy Derrick Service change rough in ok p/s u/g rec ok
|
ELE15-00847
| Electrical Rough-In | 4/2/2015 | 4/2/2015 | 4/2/2015 12:23:44 PM | P | PASS |
|
|
Bonding Inspection Phone #: ###-#### Inspection requested via web by Louis Keller Equipotential plane bonding rough in ok cover
|
ELE15-00839
| Rough-In Permanent Service | 4/2/2015 | 4/2/2015 | 4/2/2015 11:21:25 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|
ELE15-00544
| Electrical Rough-In | 4/2/2015 | 4/2/2015 | 4/2/2015 11:07:05 AM | P | CANC |
|
|
Fire caulking is done Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Inspection cancelled from web by: Shaun Kirkman
|
ELE15-00717
| Electrical Rough-In | 4/1/2015 | 4/2/2015 | 4/2/2015 10:36:16 AM | A | PASS |
|
|
Added 15 solar panels to an existing array.
The only changes electrically, was I relocated the knife switch from the far corner of the house were the meter base is located, to the detached garage where the solar array and a existing sub panel is located.
The array was completed before a formal understanding of the new rough in inspection process was addressed, so give me a call when your heading out, and I''ll meet you there with ladder and mirrors to inspect label plates on panels and inverters. All the rail and panel bonding is easily seen as is.
Thanks guys, Ryan King 208.850.8965
Phone #: ###-#### Inspection requested via web by Ryan King UL listing confirmed of grounded system. Grounding electrode system from original installation. Signage complete. Rough in ok
|
ELE15-00717
| Final | 4/2/2015 | 4/2/2015 | 4/2/2015 10:35:30 AM | P | PASS |
|
|
Added 15 solar panels to an existing array.
The only changes electrically, was I relocated the knife switch from the far corner of the house were the meter base is located, to the detached garage where the solar array and a existing sub panel is located.
The array was completed before a formal understanding of the new rough in inspection process was addressed, so give me a call when your heading out, and I''ll meet you there with ladder and mirrors to inspect label plates on panels and inverters. All the rail and panel bonding is easily seen as is.
Thanks guys, Ryan King 208.850.8965
Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
ELE15-00843
| Final | 4/1/2015 | 4/2/2015 | 4/2/2015 9:21:16 AM | A | PASS |
|
|
getting final on lighting retrofit Phone #: ###-#### Inspection requested via web by Tim Dunlop Final ok
|
ELE15-00845
| Electrical Rough-In | 3/31/2015 | 4/2/2015 | 4/1/2015 11:41:04 AM | A | CANC |
|
|
Milenko Phone #: ###-#### Inspection cancelled from web by: Tim Dunlop
|